Malaysia East Coast Railway Construction Camp

Asia· 2020
Malaysia East Coast Railway Construction Camp 1Malaysia East Coast Railway Construction Camp 2Malaysia East Coast Railway Construction Camp 3Malaysia East Coast Railway Construction Camp 4Malaysia East Coast Railway Construction Camp 5Malaysia East Coast Railway Construction Camp 6Malaysia East Coast Railway Construction Camp 7Malaysia East Coast Railway Construction Camp 8Malaysia East Coast Railway Construction Camp 9Malaysia East Coast Railway Construction Camp 10Malaysia East Coast Railway Construction Camp 11

House Type

Prefab House

Industry

Energy & Mining

Floor Area

10000-200000㎡

Use Cases

Office

Location

Asia

Year

2020

Project Overview

  1. Temporary buildings for Sections 1–8 of the Malaysia East Coast Railway project were all supplied by our company.

  2. Units for Sections 1–8 were shipped from China to the project sites on schedule within three months, in line with the client's progress requirements.

  3. The products were structurally designed for rain and moisture protection to suit local site conditions.