Plumbing and Electricity in Prefabricated Slab Houses
The renovation of plumbing and electricity in prefabricated slab houses should be carried out from three aspects: water supply, drainage, and power lines, following the design principles of safety, science, practicality, and people-orientation.

Necessity of Plumbing and Electricity Renovation
Prefabricated slab houses with brick-concrete structures and six floors, built in the 1980s or earlier, generally have aging and unreasonably designed plumbing and electrical lines due to their long service life. Systematic renovation is required to meet modern living needs.
Specific Renovation Content
Water Supply System
The original water supply pipes, mostly rusty iron pipes, pose health risks and need to be completely replaced with polypropylene buried plastic pipes. Meanwhile, the original control valves, which do not close tightly and easily cause water leakage, should be replaced with valves with better sealing performance.Drainage System
The cast-iron drainage pipes are unreasonably distributed and require redesigning the sewer pipe structure. During secondary renovation, the joints between PVC sewer pipes and cast-iron pipes should be sealed to prevent water leakage. For example, rubber sealing rings or special adhesives can be used to reinforce the joints.Power Lines
The original lines are severely aged, with some using thin copper wires or aluminum wires, and the lighting and socket circuits are not separated. It is necessary to design separate circuits according to the electrical appliance usage requirements, such as independent circuits for lighting, ordinary sockets, air conditioner sockets, and kitchen and bathroom sockets, to avoid overloading. During renovation, professional designers should be hired to scientifically allocate the power distribution system and avoid the “superficial project” of adding or removing sockets locally.
Plumbing and Electricity Design Principles
Safety First
Do not cut grooves in the prefabricated floor slab to lay pipelines, as vibrations may damage the decorative layer or even the floor slab structure of the lower floor. It is recommended to remove the old floor, lay the pipes openly and fix them, and then lay tiles or level the floor before laying the new floor.Scientific Design
Before starting construction, the design drawings should be completed, clarifying the pipeline routes and equipment locations. After completion, the drawings should be checked against the actual construction to ensure there are no omissions or errors.Practicality as the Priority
Based on the electricity meter capacity of the old house, reasonably design the strong and weak current and water supply and drainage points to avoid setting up too many high-power electrical appliance power sources that may cause overloading. For example, spare sockets can be reserved in the kitchen and bathroom, but there is no need to excessively pursue impractical functions such as “whole-house intelligence.”People-Orientation
The design should be people-oriented, and users need to plan their furniture placement and electrical appliance selection in advance. For example, the air conditioner socket should be placed away from the bedside, and the kitchen socket should consider the height of electrical appliance usage.