Mobile toilet wind prevention fixing can be achieved through methods such as ground anchor fixing, windbreak rope and diagonal tension fixing, additional weighting, and foundation site selection optimization. The specific methods are as follows:

1. Ground Anchor Fixing Method
Ground anchor fixing is one of the core methods for preventing wind damage to mobile toilets. At the four corners or key load-bearing positions of the toilet, expansion screws or ground anchor nails are used to firmly connect the fixing chains (straps) to the ground. If the site allows, concrete blocks or weighting blocks can be driven into the bottom of the toilet to increase overall stability. For example, in Jiujiang, steel wires with a diameter of over 5mm are used to connect the ground anchors to the top of the public toilets, forming a triangular tension structure that reduces wind impact through the principle of force dispersion. In Yingtan, it is emphasized that each device should be equipped with 4 fixing points, and the bottom stability is enhanced through expansion screws or weighting sandbags. This method is suitable for hard ground surfaces or scenarios requiring long-term fixing, and it is necessary to ensure that the depth of the ground anchors and the strength of the materials meet the wind resistance rating requirements.

2. Windbreak Rope and Diagonal Tension Fixing
Windbreak rope and diagonal tension fixing disperse wind pressure through multi-angle tension. Install windbreak ropes at the top of the toilet, with the other end fixed to ground stakes or heavy objects (such as concrete blocks) to form vertical tension. When the wind is strong, a "well"-shaped diagonal tension method can be used, with nylon ropes or steel wires tightening the main body of the toilet from different directions to form a three-dimensional support structure. In Yingtan, triangular support is formed by the diagonal tension ropes at the top of the device and the ground fixing points, significantly improving anti-side-tipping capability. This method requires regular inspection of rope tension to avoid fixing failure due to loosening.

3. Additional Weighting Method
Additional weighting reduces wind impact by increasing the self-weight of the toilet. Heavy objects such as sandbags or water tanks can be installed inside or outside the toilet, for example, placing 2-3 sandbags weighing 20 kilograms on each side or using a water tank filled with clean water. In Jiujiang, it is recommended to place at least 4-6 sandbags on each side to ensure that the weighting per square meter is not less than 50 kilograms. The weighting should be evenly distributed to avoid local overload causing structural deformation. If a water tank is used, its sealing should be ensured to prevent water leakage from affecting stability.

4. Foundation Site Selection and Fixing Optimization
Site selection and foundation treatment are prerequisites for wind prevention fixing. Priority should be given to selecting flat areas with good drainage and avoiding low-lying areas prone to water accumulation. If the ground is soft, gravel or wooden planks should be laid to increase friction. At the same time, check whether the supporting feet at the bottom of the toilet are intact to ensure a flat contact surface and avoid tilting due to uneven support. For example, in Yingtan, each device is required to be equipped with 4 fixing points, and the bottom stability is enhanced through expansion screws or weighting sandbags to reduce the risk of wind disasters from the source.