Waterproofing Methods for Container House Roofs
Waterproofing for container house roofs is achieved through four core steps: base layer treatment, node reinforcement, waterproof layer construction, and protective layer installation. The specific methods are as follows:

1. Base Layer Treatment:
Thoroughly remove the original ineffective waterproof layer, peeling and hollow layers, and debris from the roof until a solid concrete base surface is exposed. For cracks, create V-shaped grooves and fill them with waterproofing compound. The base layer should be leveled with cement mortar, with inside and outside corners rounded (radius ≥ 50mm). Grind a depression within a 50cm radius of drainage outlets to ensure a drainage slope of ≥ 2% to prevent water accumulation. The base layer must be dry, solid, and free of floating dust. If the moisture content is too high, allow natural drying for more than 24 hours or use a dryer to accelerate the process; otherwise, the waterproof layer may blister and delaminate.
2. Key Node Reinforcement:
For areas prone to leakage, such as inside and outside corners, pipe roots, and parapet walls, adopt the 'one-cloth-three-coats' process: first apply waterproof coating, then lay polyester or non-woven fabric as a reinforcing layer (width ≥ 200mm, overlap ≥ 100mm), and apply two more coats of waterproofing to form a reinforced layer. Pipe roots should be rounded with waterproofing compound and reinforced with polypropylene fabric. The junction between the parapet wall and the roof should have the waterproof layer turned up by more than 40cm to reduce the risk of cracking later.
3. Waterproof Layer Construction:
Choose the construction method based on the material:
- Sheet Materials (e.g., SBS Modified Bitumen): Use the hot-melt method to lay double-layer sheets (4mm + 3mm) with an overlap width of ≥ 10cm. Overflow of bitumen during hot-melt is ideal. Turn up the sheets 40cm on walls and secure the edges with metal strips.
- Coating Materials (e.g., Polyurethane): Apply 2-3 coats in a cross-hatch pattern to a total thickness of 1.5-2mm. Allow each coat to dry before applying the next. For pipe roots, inside and outside corners, etc., apply additional rubber bitumen coating and lay mesh fabric.
- Grouting Materials: For fine cracks, inject nano-modified acrylate grout under high pressure, which expands upon contact with water to form an elastic gel layer.
4. Protective Layer Installation:
After the waterproof layer passes inspection, pour a 5cm thick reinforced concrete protective layer (with embedded steel mesh) or level it with cement mortar as a protective layer, while ensuring proper drainage slope. The protective layer prevents UV damage, mechanical impact, and cracking of the waterproof layer due to temperature stress, extending its service life.
Construction Points:
- Conduct a water storage test for 24-48 hours with a depth of ≥ 50mm. The roof is considered qualified if no leakage is observed downstairs.
- The old waterproof layer must be completely removed; covering it directly with a new layer will result in insufficient adhesion.
- In rainy or humid regions, enhance ventilation or drying to ensure the base layer is dry.