Application for Street Portable Toilets
The application for street portable toilets must be completed through local administrative departments or professional service providers, with the specific process as follows:

1. Understand Policy Regulations Before applying, it is necessary to grasp the local policy requirements for the installation of portable toilets, including installation locations (such as whether they are allowed to be set up in green belts or beside sidewalks), quantity limits (such as the number allowed per square kilometer), and maintenance standards (such as cleaning frequency and disinfection requirements). These regulations are usually formulated by urban management, environmental sanitation, or municipal departments, and detailed documents can be obtained through government websites, government service windows, or telephone consultations. It is crucial to confirm whether the selected location meets hard requirements such as “not occupying fire lanes, not affecting traffic, and maintaining a certain distance from residential buildings (e.g., more than 10 meters).”
2. Prepare and Submit Application Materials When submitting an application to relevant departments or service providers, the following information must be clarified:
- Installation Location: The specific location must be marked (e.g., “beside the green belt on the northwest side of the intersection of XX Road and XX Street”), and a site selection diagram must be attached (which can be hand-drawn or marked using a map screenshot).
- Usage Requirements: Explain the reasons for installation, for example:
- High pedestrian traffic in the area but insufficient public toilets (data support is required, such as “an average daily pedestrian traffic of 5,000 people, with queues exceeding 20 minutes during peak hours”);
- Aging facilities in existing public toilets (such as “a flushing system failure rate exceeding 30%” or “3 slip incidents caused by wet floors”);
- Coverage blind spots (such as “no public toilets within 500 meters of XX Square”).
- Toilet Specifications: The type (such as single-unit or trailer-mounted), number of stalls (e.g., 3 stalls for men, 5 stalls for women, and 1 accessible stall), and supporting facilities (such as handwashing basins, deodorization systems, and smart sensor flushing devices) must be specified.
- Other Materials: Some regions require the attachment of a resident demand survey questionnaire (covering businesses or residents within 50 meters of the surrounding area) and a budget sheet (including purchase, installation, and one-year maintenance costs, such as “a total budget of 80,000 yuan”).
3. Await Review and Make Adjustments After receiving the application, the administrative department may conduct an on-site inspection, focusing on verifying:
- Whether the selected location complies with safety regulations (such as whether it blocks traffic signs or affects underground pipelines);
- Whether the specifications meet actual needs (such as whether there are more stalls for women than for men);
- Whether the maintenance plan is feasible (such as whether the cleaning responsibility party is clearly specified). If the application is not approved, adjustments must be made based on the feedback (such as changing the location or adding accessible facilities) and resubmitted.
4. Installation and Subsequent Management After approval, installation must be carried out as instructed, and a maintenance agreement must be signed (clearly specifying that the street sanitation team or a third-party cleaning company is responsible). It is necessary to set up a “Free Open” sign and usage instructions (such as prohibiting smoking and conserving water), and regularly disclose maintenance records (such as cleaning 3 times a week and disinfecting once a month) to ensure hygiene standards are met.