Shijiazhuang Zanhuang Prefabricated Houses

Admin September 18, 2026

The prefabricated houses in Zanhuang County, Shijiazhuang mainly include two types: light steel villas and brick-concrete structure villas. The construction processes and key construction points are as follows:

Light Steel Villas

Business Process

  1. Demand Communication and Scheme Design: A professional team conducts on-site inspections of the homestead and provides multiple schemes based on user needs (usage, budget, style preferences, etc.), covering floor plans, exterior renderings, and 3D models, along with a detailed budget. For example, if a user prefers a modern and minimalist style, the team will design simple facade lines and an open layout.
  2. Material Procurement and Construction Preparation: Rust- and corrosion-resistant steel is selected as the main structural material to ensure durability. A construction team is assembled and trained, and assistance is provided in obtaining approvals such as rural construction planning permits. Meanwhile, the site is cleared and temporary facilities are set up.
  3. Main Structure Construction: Prefabricated steel components are assembled on-site. The construction process includes steel column installation, steel beam connection, and floor decking laying. The quality of node welding is crucial and must meet seismic design requirements to ensure structural stability. Light steel villas have a short construction period and are suitable for rapid delivery needs.
  4. Roof and Capping Construction: Depending on the design, a pitched roof or a flat roof is chosen. For a pitched roof, attention should be paid to the drainage slope design (usually ≥ 5%). After laying the waterproof layer, insulation materials are installed, and finally, roof tiles are laid. For a flat roof, enhanced waterproofing and heat insulation treatments are required.

Brick-Concrete Structure Villas

Key Construction Points

  1. Foundation Construction: In response to the shallow hilly terrain in Zanhuang County, the "graded excavation" technique is used to address terrain adaptation and settlement prevention issues. For example, in gravel soil areas, the foundation trench excavation depth is ≥ 1.5 meters, and in sandy clay areas, the excavation slope is set at 1:0.6, with the slope supported by woven bags filled with soil. The cushion construction is adjusted according to the foundation type: for gravel soil foundations, graded gravel is laid first, followed by concrete pouring; for sandy clay foundations, cement is added to the cushion to enhance stability. For foundation masonry, rubble concrete foundations or strip foundations are preferred to improve bearing capacity.
  2. Main Structure Construction: With brick wall bearing as the core, the construction includes masonry wall construction, floor pouring, and ring beam construction. The masonry walls must ensure a mortar joint fullness rate of ≥ 80% and a verticality deviation of ≤ 5 mm. The floors are cast-in-place concrete to enhance overall integrity. Ring beams are set at each floor level and form a frame with structural columns to improve seismic performance.

Both types of houses must strictly follow construction norms. Light steel villas focus on industrial assembly efficiency, while brick-concrete structure villas emphasize foundation treatment and structural stability. Users can choose an appropriate scheme based on their budget, construction period, and terrain conditions.