Custom Construction Process of Prefabricated Houses
Admin September 18, 2026
The custom construction process of prefabricated houses is mainly divided into three stages: construction preparation, main construction, and final inspection and acceptance. The specific steps are as follows:

I. Construction Preparation Stage
- Construction Site Preparation
The site needs to be leveled, with debris and obstacles cleared to ensure a flat, solid, and well-drained surface. Measurement and layout are carried out according to the design dimensions and layout of the house, while temporary facilities (such as temporary offices, warehouses, and material storage yards) are erected, and construction roads are kept clear to provide basic conditions for subsequent construction. - Personnel Preparation
Organize a professional construction team, including project managers, construction workers, technicians, and quality inspectors, with clear division of labor and responsibilities. All construction personnel should receive training in the construction technology of prefabricated houses to ensure they are familiar with component installation specifications, safe operation procedures, and quality acceptance standards. - Material Preparation
Procure prefabricated components (such as wall panels, floor panels, and roof panels) and auxiliary materials (such as steel bars, cement, sand and gravel, connectors, and sealants) that meet standards according to design requirements. Materials should be inspected and qualified before entering the site and stored in dry, ventilated warehouses or storage yards by category to avoid deformation or damage to components.
II. Main Construction Stage
- Foundation Construction
Select the foundation form (such as strip foundation, independent foundation, or raft foundation) according to the type of house to ensure accurate foundation dimensions, and compliance with horizontal and vertical standards. The arrangement of steel bars should meet design requirements, and concrete should be cured to the design strength after pouring to ensure the foundation bearing capacity meets the load requirements of the house. - Component Transportation and Storage
After being produced in the factory, prefabricated components should be transported to the site using special transportation tools (such as flatbed trucks and cranes), and firmly fixed during transportation to prevent collision damage. Upon arrival at the site, components should be stacked by type and installation sequence to avoid damage caused by secondary handling. - Main Body Installation
Lift prefabricated components to the installation position using a crane and splice them using special connectors or bolts to ensure a firm connection. During installation, tools such as laser levels and plumb lines should be used to monitor verticality and horizontality in real-time, adjust deviations promptly, and strictly follow the installation sequence (such as installing columns and beams first, then floor panels and wall panels). - Enclosure Structure Installation
Install enclosure panels (such as metal panels and composite panels) for walls and roofs to ensure the panels are flat and tight, with panel joints treated with sealant to prevent rainwater leakage. Windows and doors should be accurately positioned, open flexibly, and be tightly connected to the walls to ensure the airtightness and thermal insulation of the house.
III. Final Inspection and Acceptance Stage
- Interior Decoration
Complete the decoration of walls, floors, and ceilings (such as painting, tiling, and floor laying) and install water and electricity lines. Water and electricity installations should comply with safety regulations to ensure electrical safety and smooth water supply, while maintenance access points should be reserved for later maintenance. - Comprehensive Inspection and Debugging
Inspect functions such as the opening and closing of windows and doors, water and electricity supply, and waterproofing effects of the house one by one, and promptly rectify any problems found. For example, test the waterproofing performance of the roof and walls through a water spraying test to ensure no leakage; test the continuity and voltage stability of water and electricity lines to ensure safe use. Finally, it must meet design requirements and usage standards before delivery.