The installation of prefabricated floor panels varies depending on the type. Here are the key points for installing different types of prefabricated panels:

Installation of Prefabricated Interior Wall Panels: First, measurement and marking are required, including marking lines for positioning, 0m control lines, and elevation control lines. These lines serve as fundamental references for installation, ensuring the accuracy of the installation position. After marking, install the elevation adjustment control bolts for the bay windows. These bolts are used to precisely adjust the elevation of the bay windows, ensuring flatness after installation. Next, install the temporary positioning adjustment components on the lower layer to provide temporary support and positioning for subsequent lifting. Finally, slowly lift the bay windows using a tower crane, closely monitoring their position and orientation during the lifting process to ensure accurate placement.

Installation of Prefabricated Wall Panels: Before lifting, measurement and marking are necessary to mark the positioning lines for the exterior wall panels, clarifying their specific installation positions. Correct any skewed reinforcing bars to ensure their verticality and accurate positioning, providing favorable conditions for subsequent connections. Use a dedicated reinforcing bar positioning plate to verify the positioning and verticality of the reserved reinforcing bars, further ensuring the installation quality of the reinforcing bars. Place adjustment shims to fine-tune the elevation and levelness of the wall panels. Use a level to verify the elevation, precisely controlling the installation height of the wall panels. After completing these steps, pour concrete to firmly connect the wall panels to the structure.

Installation of Prefabricated Composite Panels: Before lifting, a lifting steel beam can be used as the lifting fixture for the composite panels to ensure that the lifting points bear force simultaneously, allowing the components to be lifted smoothly. This is to avoid issues such as cracks or distortion during the lifting process, ensuring the integrity of the composite panels. Slowly lift the prefabricated panels using a tower crane, controlling the speed and orientation during the lifting process, and slowly moving them above the installation position before accurately lowering them into place.

Installation of Prefabricated Concrete Floor Panels: There are corresponding assembly techniques. For example, for a floor panel with a characteristic thickness of 120 millimeters, there are 8 main reinforcing bars. When labeled as 'a', it indicates the total length of the floor panel minus 2 centimeters. In cases without labeling, specific conditions apply, and installation should be carried out according to specific design and regulatory requirements. During installation, ensure the flatness of the floor panels and their firm connection to the surrounding structures to ensure that the floor panels can withstand the corresponding loads.