The full paving of floor tiles in mobile toilets requires following three core steps: pre-treatment, formal paving, and finishing, along with strict control over material selection. The specific operations and precautions are as follows:

I. Pre-treatment Stage
- Floor Cleaning: Thoroughly remove dust, debris, and oil stains from the floor to ensure a flat and crack-free base. If the floor is uneven, use cement mortar to repair it until the error is ≤3mm, preventing hollowing during subsequent paving.
- Floor Drain Treatment: Reserve a position for the floor drain during full paving. Lay a waterproof blanket (thickness ≥2mm) around the floor drain opening and apply a waterproof coating (such as polyurethane) three times to form a closed layer, preventing water from penetrating into the structural layer.
II. Formal Paving Stage
- Cement Mortar Layer: Mix cement mortar in a 1:3 ratio, with a thickness controlled between 30-50mm. Use a scraper to level it and let it stand for 2 hours. Begin paving after the surface has initially set.
- Paving Operations:
- Layout and Positioning: Pave from the toilet entrance inward. First, arrange the tiles for trial paving, adjusting the gaps (recommended 2-3mm) and color patterns to ensure overall symmetry.
- Glue Application: Use tile-specific adhesive (such as C2TE grade) and evenly apply it to the back of the tiles and the floor. The application area should not exceed half of a single tile to prevent the adhesive from drying out.
- Pressing and Adjustment: Press the tiles onto the floor and lightly tap them with a rubber mallet until they are flush with the surrounding tiles. Use a level gauge to check the flatness in real-time, with an error ≤1mm.
- Paving Sequence: Follow the principle of 'from inside to outside, from top to bottom'. The corner tiles should be consistent with the overall direction to avoid sharp-angle splicing.
III. Finishing Stage
- Cement Line Welding: After paving, fill the tile gaps with cement mortar. When it is semi-dry (about 4 hours), use a jointing tool to scrape out grooves with a depth of 1-2mm to enhance waterproofing.
- Anti-slip Strip Installation: In slippery areas such as around the toilet and in the shower area, embed PVC or aluminum alloy anti-slip strips (width ≥50mm) with a height protruding 2-3mm above the tile surface to ensure anti-slip effects.
IV. Material Selection Points
- Anti-slip Properties: Prioritize anti-slip tiles with a static friction coefficient ≥0.775 (such as rustic tiles or full-body tiles), avoiding smooth materials like polished tiles or vitrified tiles.
- Ease of Cleaning: Recommend glazed tiles or anti-fouling coated tiles with a surface roughness Ra ≤3.2μm to reduce dirt adhesion.
- Lightweight and Durability: The weight of a single tile should be ≤15kg, or choose PVC flooring (thickness 2-3mm) for easy movement and disassembly.
- Joint Treatment: Use a joint filler (such as epoxy resin) to fill the joints, ensuring airtightness and preventing water vapor penetration that could cause hollowing.
Related
You may also like

25Oct
Container House Installation Guide: A Complete Walkthrough
Read More
25Oct
Portable Toilet Eco-Friendly Custom & OEM: Design & Bulk Production Guide
Read More
25Oct
How to Assemble & Install Container House Step by Step
Read More
25Oct