Kostolac Power Plant Camp, Serbia

Europe· 2013
Kostolac Power Plant Camp, Serbia 1Kostolac Power Plant Camp, Serbia 2Kostolac Power Plant Camp, Serbia 3Kostolac Power Plant Camp, Serbia 4Kostolac Power Plant Camp, Serbia 5Kostolac Power Plant Camp, Serbia 6Kostolac Power Plant Camp, Serbia 7Kostolac Power Plant Camp, Serbia 8Kostolac Power Plant Camp, Serbia 9

House Type

Prefab House

Industry

Energy & Mining

Floor Area

4000-10000㎡

Use Cases

Accommodation / Office

Location

Europe

Year

2013

Project Overview

  1. As Chengdong's first engineering camp project in Europe, this project combined accumulated experience with innovative practice and set a benchmark for Chengdong's outstanding projects in the region.

  2. Industry benchmark recognition: with high-standard construction and refined management, it was awarded the title of “Benchmark Construction Camp.”

  3. Technical breakthrough: a key advance in the ZA house double-layer rebar roof system, with upper and lower rebar working together, greatly improved crack resistance, compressive strength, and seismic performance, reinforcing the safety foundation.

  4. Agile, robust support: a large volume of technical revisions was completed efficiently on site; urgent needs were met quickly and components were reworked, ensuring zero delay in project progress.

  5. Lasting appearance and quality: the roof uses baked-enamel color profiled steel sheets with outstanding weather resistance, combining practicality with visual quality.