Inner Mongolia Mining Staff Container Apartments

China· 2025
Inner Mongolia Mining Staff Container Apartments 1Inner Mongolia Mining Staff Container Apartments 2Inner Mongolia Mining Staff Container Apartments 3Inner Mongolia Mining Staff Container Apartments 4Inner Mongolia Mining Staff Container Apartments 5Inner Mongolia Mining Staff Container Apartments 6Inner Mongolia Mining Staff Container Apartments 7Inner Mongolia Mining Staff Container Apartments 8Inner Mongolia Mining Staff Container Apartments 9Inner Mongolia Mining Staff Container Apartments 10

House Type

Container House

Industry

Energy & Mining

Floor Area

4000-10000㎡

Use Cases

Accommodation / Office / Dining

Location

China

Year

2025

Project Overview

  1. Dormitory approach: The client initially chose container houses with tiled bathrooms, but the two construction methods did not connect well and created many site difficulties that would affect later use. We recommended container houses plus prefabricated bathrooms, which better met the client's needs, greatly shortened construction time, and reduced delays caused by cold weather.

  2. Cold protection and insulation: Because the site is very cold, the original external exposed piping was changed to indoor concealed pipe shafts, integrating the building more fully and preventing freeze damage. Wider sealing strips were also designed between floors to reduce air leakage from the container structure and further improve thermal performance.

  3. Heightened and lengthened office building: Drainage pipes for the third-floor bathrooms had to run through the second-floor ceiling. To control cost, a color-steel ceiling was used with a hanger-rod and guide-rail ceiling structure.