Zhungeer Container House Installation

Admin September 15, 2026

For the installation of container houses in Zhungeer, it is crucial to focus on construction plan planning, supplier selection, installation process, and acceptance criteria. The specific key points are as follows:

I. Construction Plan Planning

  1. Foundation Treatment
    The site should be leveled in advance, and the foundation bearing capacity should meet the requirements to avoid later settlement. For example, container houses used outdoors for a long time need concrete piers or steel frame reinforcement at the corners to enhance wind and earthquake resistance. If the site is soft soil or a slope, pile foundations or ground beams should be used for reinforcement.

  2. Drainage and Damp-proof Design
    Plan to embed drainage pipes to avoid water accumulation. The construction plan should clearly specify slope drainage design, such as a roof slope of ≥5% for rapid rainwater diversion. A damp-proof membrane can be laid at the bottom or the foundation can be raised to prevent groundwater infiltration.

  3. Modular Layout Optimization
    Divide areas according to functional requirements (such as office, accommodation, and storage), and reasonably plan the positions of doors and windows as well as circuit reserved openings. For example, a mobile sentry box provided by a manufacturer in Guangzhou adopts a modular design, requiring only simple wiring and fixing on site, and can be installed by two workers in half a day.

II. Supplier Selection Criteria

  1. Qualifications and Experience
    Give priority to manufacturers with formal business qualifications and the ability to process high-strength steel. For example, Inner Mongolia Xinhe Integrated Housing Technology Co., Ltd. prefabricates components in standardized factories, achieving full-chain control, and serves customers in scenic spots, rural construction, and other fields.

  2. Quote Transparency
    Require suppliers to provide a detailed material list and quote to eliminate hidden additional costs. The contract should clearly specify material specifications (such as steel plate thickness and frame material), fire rating certification, and structural load-bearing test reports.

  3. After-sales Response Mechanism
    Confirm fast operation and maintenance support and spare parts supply channels during the warranty period. For example, Xinhe Company promises regular inspection and component replacement response times to reduce long-term holding risks.

III. Key Points of the Installation Process

  1. Lifting and Fixing
    Use professional lifting equipment and select appropriate lifting points to avoid deformation. Upper and lower container layers should be fixed with angle steel gusset bolts to ensure structural stability. For example, a double-story container office requires integral welding technology, with a steel plate thickness of ≥1.0mm and a load capacity of 2500kg-5000kg.

  2. Sealing and Anti-corrosion Treatment
    Check the sealing of doors, windows, and wall joints, and use anti-corrosion wood exterior walls or polyurethane foam composite panels to improve weather resistance. For example, Lanzhou Liqun Company uses polyurethane foam integrated forming technology to create panels with excellent thermal insulation performance, suitable for alpine regions.

IV. Acceptance Criteria

  1. Structural Safety Inspection
    Check the welding quality of the frame, foundation settlement, and wind and earthquake resistance design (such as steel frame reinforcement and concrete piers).

  2. Functional Integrity Check
    Test the circuit system, drainage slope, and smoothness of door and window opening and closing to ensure no leakage or short-circuit problems.

  3. Material Compliance Verification
    Check whether the steel plate thickness and fireproof material grade meet the contract requirements. For example, the wall should use 50mm thick rock wool color steel plates with a fire rating of Class A.