Zhanjiang Prefabricated House Foundation Piers
The prefabricated foundation piers for houses in Zhanjiang typically use prefabricated concrete components. Their construction principles and processes can refer to those of prefabricated concrete isolation piers. The main body is pre-cast in a factory or on-site, with designs following standardized specifications.

Production Process
The production of prefabricated foundation piers must strictly adhere to standardized processes. First, steel or wooden molds of specific dimensions and shapes are made according to the design drawings. The inner surface of the molds must be smooth and flat to ensure the surface quality of the components. Subsequently, the well-mixed concrete mixture is poured into the molds, and vibrating equipment is used to expel air bubbles and ensure dense filling, avoiding internal defects. After pouring, curing is carried out in a controlled temperature and humidity environment to allow the cement to fully hydrate and reach the designed strength before demolding. The curing time is usually determined based on the concrete mix and environmental conditions, typically requiring 7-14 days. After passing inspection, the components can be transported to the construction site.
Installation Points
Before installation, the foundation must be leveled and compacted to ensure that the bearing capacity meets the design requirements. Precise setting-out and positioning are carried out according to the construction drawings, possibly using total stations and other equipment to verify coordinates and elevations. During lifting, specialized equipment (such as truck cranes) is used to accurately place the foundation piers in position, and adjacent piers are fixed using bolts, pins, or specialized connectors, or connected to the ground foundation through embedded parts to form a unified structural system. In some cases, after demolding, the components need to be inspected for surface damage, cleaned of residues, and coated with release agents. During installation, adjustments are made to the verticality and spacing, and dimensional deviations are verified to be within the allowable range (e.g., verticality deviation ≤ H/1000, spacing deviation ±5mm).
Maintenance and Reinforcement
If cracks or other defects occur in the prefabricated foundation piers, local reinforcement companies in Zhanjiang can provide repair services, including concrete crack repair, pier reinforcement, and color difference treatment. Repair processes may involve high-pressure grouting, carbon fiber cloth reinforcement, or surface coating treatment, with specific plans determined based on the type and extent of the defects. It should be noted that while the reference information does not explicitly mention specific application cases for house prefabricated foundation piers, the general principles and processes of prefabricated components can be analogously inferred. In actual engineering, specific design requirements and specifications must be followed.