Back to blog
Article

Suixian Concrete Prefabricated House

Admin September 18, 2026

There is currently no clear information indicating that there are complete concrete prefabricated house project cases in Suixian. Here is a detailed analysis:

Suixian Yinghui Building Materials Co., Ltd. Project: This company has newly built a commercial concrete mixing project on the west side of Suiping Road, west of Yonglou, Danzhuang Village Committee, Baimiao Township. The main construction content includes one set of concrete mixers and one material shed. This project focuses on the production of commercial concrete rather than the direct construction of concrete prefabricated houses. Moreover, the project has been found to have started construction without legally applying for environmental impact assessment documents and has been ordered to make corrections by the Shangqiu Municipal Ecology and Environment Bureau. From the nature of the project and the non-compliance issues, it cannot provide valid information about concrete prefabricated houses in Suixian.

Project Undertaken by Gansu Third Construction Group Co., Ltd.: Gansu Third Construction Group Co., Ltd. undertook the renovation project of Kangxin Jiayuan shantytowns in Suixian, where the concrete pouring on the seventh floor of Building 12 was successfully completed. The project adopted the "aluminum formwork + climbing frame" system for efficient construction and established a four-level acceptance system to ensure quality. However, throughout the project description, there is no explicit mention of whether the houses adopt a prefabricated structure. Therefore, it cannot be determined that this project is directly related to concrete prefabricated houses.

Suixian Shengyuantianhucheng Residential Community Project: The Suixian Shengyuantianhucheng residential community adopts a reinforced concrete fully cast-in-place floor structure, including townhouses, stacked villas, multi-story and high-rise apartments. There is a fundamental difference between a fully cast-in-place floor structure and a prefabricated structure. The fully cast-in-place structure involves pouring and forming concrete on the construction site, while the prefabricated structure involves pre-fabricating components in a factory and then transporting them to the construction site for assembly. Therefore, this project does not belong to a concrete prefabricated house project either.