Rongchang Mobile Toilet Installation
The installation of mobile toilets in Rongchang is essentially a highly integrated modular functional system. After being prefabricated, tested, and preliminarily assembled in the factory, only basic positioning and external water and electricity connections are required on-site before they can be put into use. The specific installation steps and precautions are as follows:

1. Comprehensive Pre-installation Inspection
It is essential to check whether there are any obstructions such as sand or waste paper inside the sewage pipes to avoid subsequent usage issues caused by pipe blockages. Additionally, confirm that the ground around the toilet installation site is level in all directions. If the ground is uneven, it should be corrected using a bedding layer or by adjusting the installation base to ensure equipment stability.
2. Determine the Sewage Pipe Center
Turn the toilet upside down with the sewage outlet facing upwards. Draw a cross-center line at the center of the sewage outlet and extend it to the edges around the bottom of the toilet. This step requires the use of a level for calibration to ensure that the center line aligns perfectly with the center of the ground sewage pipe, preventing seal failure or poor drainage due to misalignment.
3. Precise Positioning of the Bottom Feet
Based on the mounting holes for the bottom screws of the toilet, use an impact drill to make holes in the ground. The depth of the holes should match the length of the expansion screws. After drilling, embed the plastic sleeves of the expansion screws, ensuring they are fully inserted into the holes and flush with the ground surface to prevent the toilet from tilting due to protruding sleeves during subsequent installation.
4. Proper Bottom Sealing
Install a dedicated sealing ring at the toilet's sewage outlet to ensure a tight fit. If using glass glue (putty) or cement mortar for sealing, mix cement and sand in a 1:3 ratio and apply it evenly around the sewage pipe. The application thickness should cover the gap between the sewage pipe and the toilet interface. Proceed to the next step only after the cement mortar has fully cured.
Additional Notes
For custom mobile toilet solutions or quotes, you can contact Jinhua Xin'an Steel Structure Engineering Co., Ltd. (Address: Houle Community, Niansanli Street, Yiwu City, Zhejiang Province). The company offers customized services for mobile restrooms, allowing adjustments to size, functional modules, and exterior design based on site requirements. During installation, strictly follow operational guidelines to ensure secure connections of water and electricity interfaces, preventing leaks or electrical failures due to improper installation.