How Much Is the Demolition Compensation per Square Meter for Prefabricated Panel Houses
There is no unified standard for the demolition compensation price of prefabricated panel houses, which needs to be determined based on local policies and assessment conditions. Details are as follows:

I. Basis for Determining Compensation Prices
The core basis for the demolition compensation of prefabricated panel houses is the market price of similar commercial housing in the surrounding area on the date of the expropriation announcement. This principle is clearly stipulated in the 'Regulations on the Expropriation and Compensation of Houses on State-owned Land', aiming to ensure that the value of the expropriated house is equivalent to the market level. For example, in an expropriation project in Ningbo, Zhejiang in 2026, an old building with a brick-concrete second-class structure and a 25-year age was assessed at 23,960 yuan per square meter, directly reflecting the local market's recognition of the house's value.
II. Compensation Differences in Different Regions
Due to differences in regional economic development levels, land costs, and house structures, there are significant differences in compensation prices. In some regions, the compensation for prefabricated brick-concrete structure houses is about 2,800 yuan per square meter, which is significantly lower than the Ningbo case, mainly due to the lower real estate market value or different house structure standards in the local area. In addition, factors such as the construction age, usage condition, and supporting facilities of the house also affect the assessment results. For example, old houses may receive lower compensation due to a higher depreciation rate.
III. Dispute Resolution Mechanism
If the expropriated person has objections to the assessment results, they can apply for a re-assessment in accordance with the law. According to relevant regulations, the assessment agency must be selected through negotiation by the expropriated person or through methods such as lottery drawing or drawing lots to ensure an open and transparent assessment process. The application for a re-assessment must be submitted within 10 days from the date of receipt of the assessment report, and the assessment agency should issue the review results within 10 days from the date of receipt of the application. This mechanism provides a way to protect the rights and interests of the expropriated person and avoids losses due to assessment deviations.
IV. Policy Basis and Implementation
The specific compensation standards shall be based on the official documents or demolition plans issued by the local government. When formulating compensation plans, local governments will comprehensively consider factors such as land use, planning requirements, and financial capacity, and solicit public opinions through hearings and public announcements. Therefore, the expropriated person needs to closely follow the announcements issued by the local expropriation department and stay informed of the details of the compensation policies in a timely manner to avoid affecting their rights and interests due to information lag.