Prefabricated Houses in Fenyang
The information related to prefabricated houses in Fenyang mainly pertains to the reinforcement project of prefabricated panel buildings within Fenyang Prison, involving Building 2 and Building 5. Details are as follows:

I. Basic Building Information
- Building 2: The building has an overall length of 57.5m and a width of 14.9m. In terms of floor height, the height from the first to the third floor is uniformly 3.6m. Through these length, width, and floor height data, one can roughly understand its spatial structure. Its building area is approximately 2720.64m², which is a relatively large single building in the context of prison architecture, capable of accommodating multiple functional areas and spaces for personnel activities.
- Building 5: The building has an overall length of 63.5m and a width of 14.4m, with the same floor height of 3.6m from the first to the third floor. Its building area is approximately 2979.84m², which is larger than that of Building 2. In the overall layout of the prison, it may undertake more important functions or accommodate more personnel and facilities.
II. Reinforcement Project Content The reinforcement project primarily targets Building 2 and Building 5 within the prison and also encompasses corresponding other renovation projects affected by the reinforcement works of these two buildings. This means that the reinforcement work is not limited to strengthening the structures of Building 2 and Building 5 themselves but also needs to consider the renovation needs of surrounding related areas triggered by the reinforcement of these two buildings, such as adjustments and renovations to corridors and ancillary facilities connected to these two buildings.
III. Scope of the Project The project covers all content within the bill of quantities and drawings. The bill of quantities details all the materials, labor, and specific construction projects required for the reinforcement project, serving as an important basis for project budgeting and construction scheduling. The drawings provide precise depictions and explanations of the reinforcement parts and methods of the buildings from a professional perspective, and construction personnel need to operate strictly in accordance with the requirements of the drawings to ensure the quality and safety of the reinforcement project and guarantee that the prison buildings can meet normal usage requirements and safety standards after reinforcement.