Prefabricated House Process
The production and installation process of prefabricated houses mainly includes two core aspects: industrial production of building components and on-site assembly.

In the industrial production of building components phase, the first step is to prepare raw materials, such as steel bars and concrete, which must undergo strict quality inspections to ensure compliance with building standards. Subsequently, the fine processing stage begins, where steel bars are bent, cut, and welded to form skeletal structures that meet design requirements; concrete is mixed according to specific ratios and poured into pre-designed molds, then cured to form walls, floor slabs, and other components. During this process, the application of automated production lines and precision molds ensures the dimensional accuracy and surface quality of the components, enhancing production efficiency. Additionally, some prefabricated components integrate systems such as doors, windows, and pipelines, enabling “one-stop” production and reducing on-site construction work.
In the on-site assembly phase, foundation construction is the first step, involving excavation of foundation pits, pouring of foundation concrete, and embedding of base beams to ensure the stability of the house. After the foundation is completed, modular installation begins. Single-story prefabricated modular houses typically use lifting methods to transport prefabricated walls, floor slabs, and other components to designated positions one by one, securing them with bolts or welding. For multi-story or complex structures, the bottom modules are installed first, followed by layer-by-layer stacking, while ensuring that the verticality and levelness of each layer meet design requirements. During assembly, auxiliary structures such as fixing bolts and connectors are installed to enhance the overall integrity and seismic resistance of the house. Finally, interior and exterior decoration and equipment installation, such as floor laying, door and window installation, and connection of water and electricity pipelines, are carried out to complete the final delivery of the house.
Throughout the process, the close coordination between industrial production and on-site assembly not only shortens the construction period but also reduces on-site work volume and minimizes environmental impact, reflecting the efficient, eco-friendly, and sustainable characteristics of prefabricated houses.
You may also like

Portable Toilet Eco-Friendly Rental in 2026: Buying Guide & Recommendations
Read More
House Thickness Size & Area Guide: Finding the Right Fit
Read More
Portable Toilet Movable House Explained: How to Choose the Right One
Read More