The site survey for mobile toilets should focus on five core aspects: site conditions, infrastructure, usage requirements, safety compliance, and communication records, ensuring scientific site selection, reasonable configuration, and controllable risks.

I. Verification of Basic Site Conditions

  1. Ground Conditions: It is necessary to confirm that the installation location has a flat and solid ground, free from low-lying, damp, or soft areas, to avoid water accumulation during rainy days or foundation settlement. For example, the construction site in Luohe requires a ground bearing capacity of ≥200kg/㎡, necessitating the removal of debris and the laying of gravel or concrete foundations; the Beijing project emphasizes avoiding low-lying areas with insufficient bearing capacity to prevent stability issues due to geological conditions.
  2. Spatial Layout: It is essential to mark the entrances, exits, passageways, fire exits, and concentrated toilet areas to ensure that the layout meets the needs of pedestrian evacuation and does not occupy fire exits or barrier-free access paths. For instance, the Henan exhibition requires mobile toilets to be at least 8 meters away from the nearest fire exit to avoid affecting emergency evacuation.
  3. Environmental Risks: It is crucial to stay away from main construction roads, pollution sources (such as septic tanks, garbage dumping sites), and flammable and explosive materials. The construction site in Luohe suggests a distance of ≥1.5 meters from the edge of the foundation pit, while the Beijing project emphasizes adapting to different geological conditions to avoid equipment damage or safety hazards due to environmental risks.

II. Infrastructure Connection

  1. Water and Electricity Connections: It is necessary to confirm whether the site has water supply (tap water or dedicated water tanks), drainage (sewage pipes or temporary collection pits), and electrical conditions (electricity for lighting and ventilation equipment). For example, the Henan exhibition requires advance connection of sewage pipes or water and electricity connections to ensure the normal operation of the equipment.
  2. Clearance Routes: It is essential to plan the entry and exit paths for sewage trucks and supply trucks to ensure no congestion during peak hours. The Beijing project mentions the need to reserve windows for entry and exit to avoid affecting equipment maintenance or clearance efficiency due to traffic issues.

III. Matching Usage Requirements

  1. Pedestrian Flow Estimation: It is necessary to estimate toilet usage needs based on the type of exhibition, duration, and peak hours. For example, the Henan exhibition configures one mobile toilet for every 500 people and increases the reserve quantity during peak hours to ensure a balance between supply and demand.
  2. Special Requirements: It is essential to check whether barrier-free facilities, night lighting, or customized signage are needed. The Henan exhibition requires testing the functionality of barrier-free facilities to ensure convenience for special groups.

IV. Safety and Compliance

  1. Safety Signage: It is necessary to set up warning signs around the toilets for collision prevention and electrical safety to reduce accidental risks.
  2. Compliance: It is essential to comply with fire safety regulations and local temporary facility management requirements to avoid suspension or fines due to non-compliance.

V. Record-Keeping and Communication

  1. On-Site Records: It is necessary to draw a floor plan, marking the location numbers, peak pedestrian flow directions, and surrounding sensitive areas (such as residential areas, dining areas) to provide a basis for subsequent management.
  2. Communication with Service Providers: It is essential to provide the rental company with the site floor plan, pedestrian flow periods, usage duration, and basic conditions, clarifying equipment configuration, transportation and installation, and emergency response mechanisms to ensure smooth collaboration.