Mobile Toilet Bid Document

Admin September 20, 2026

The mobile toilet bid document should include the following core content, and should be prepared in strict accordance with the requirements of the bidding documents, with specific details supplemented:

I. Bid Letter The bid letter should clearly state the name and number of the bidding project, the full name of the bidding unit, the total bid price, the construction period or delivery period (e.g., "complete delivery within 50 calendar days"), and the quality standards (e.g., "comply with the national environmental protection toilet standard GB/T 18092-2008"). It should also declare full compliance with all terms of the bidding documents. For example, if the bidding documents require that joint bids are not accepted, a clear commitment should be made in the letter.

II. Bid Price

  1. Total Bid Price: Fill in the amount specified in the bidding documents (e.g., the project budget for Chongqing in 2024 is 690,000 yuan), which should be consistent with the summary of itemized bids.
  2. Itemized Bids: List in detail according to equipment model, quantity, and unit price (e.g., "6-stall vacuum environmental protection mobile toilet, unit price 80,000 yuan, total of 5 units, total price 400,000 yuan"), and indicate whether transportation and installation costs are included. Refer to the winning bid announcement of the Tangwang County project to clarify the correspondence between specifications, models, and total prices.

III. Technical Solution

  1. Product Specifications and Performance: Describe the toilet dimensions (e.g., length 6m × width 3m × height 3.2m), materials (e.g., stainless steel frame + color steel plate walls), and functions (e.g., vacuum sewage suction, intelligent induction flushing, solar power supply) in accordance with the technical requirements of the bidding documents. Attach physical photos or design drawings to enhance persuasiveness.
  2. Technical Parameter Response Table: List the bidding parameters one by one (e.g., "daily processing capacity per stall ≥ 200 person-times"), mark "meets" or "exceeds", and provide test reports as evidence. For example, the Shanghai project may require "sewage storage tank capacity ≥ 1.5 cubic meters", and a clear response should be provided.

IV. Construction Organization Design (if installation is involved)

  1. Project Implementation Plan: Develop a construction schedule (e.g., "production for 20 days → transportation for 5 days → installation and commissioning for 10 days") and clarify key milestones.
  2. Quality Assurance Measures: Describe the quality management system (e.g., ISO9001 certification), testing process (e.g., full inspection before leaving the factory), and attach raw material certificates and product test reports.

V. After-sales Service Plan

  1. Warranty Period Commitment: Clearly state the duration (e.g., "2-year warranty") and service content (e.g., free replacement of consumable parts).
  2. Emergency Response Mechanism: Provide a 7×24-hour hotline and promise to respond within 2 hours and repair within 24 hours after a fault is reported.
  3. Training Plan: Provide equipment operation and maintenance training for the purchaser's operators (e.g., "2 on-site practical training sessions, each lasting 4 hours").

VI. Corporate Qualifications and Performance

  1. Qualification Certificates: Attach business licenses, tax registration certificates (or three-in-one certificates), and specific qualifications (e.g., "Environmental Protection Engineering Professional Contracting Level III Qualification").
  2. Similar Project Performance: List similar projects completed in the past three years (e.g., "completed 20 mobile toilets for XX Scenic Area in 2023") and attach copies of contracts or user evaluations.

VII. Other Materials

  1. Legal Representative's Identity Certificate or Power of Attorney: If a branch bids, a power of attorney from the legal representative is required.
  2. Bid Bond Certificate: Attach a copy of the bank receipt or guarantee letter (e.g., Longteng Avenue project requires a 3,000-yuan cash deposit).
  3. Other materials required by the bidding documents: such as "Credit China" query screenshots and statements of no major illegal records.

Precautions:

  1. Prepare the bid document strictly in accordance with the format specified in the bidding documents to avoid omitting any terms (e.g., the Shanghai project requires a "Small and Micro Enterprise Declaration Letter").
  2. The bid document should be stamped with the official seal and signed by the legal representative, and bound as required (e.g., 1 original copy and 4 duplicate copies).
  3. Deliver it to the designated location before the submission deadline (e.g., "submit to 380 Hongcao Road, Xuhui District before 10:30 on June 6, 2025").

It is recommended to refer to the "Bid Document Format" section of the actual bidding documents or consult the bidding agency for detailed information.