The installation of mobile toilets in Lvliang requires tailored plans based on different types (ordinary, modular steel structure for construction sites, and bus-mounted), with the following key points:

I. Installation of Ordinary Mobile Toilets

  1. Construction Preparation

    • Technical Preparation: Organize technicians to familiarize themselves with the drawings, prepare construction plans and technical disclosure documents, and train construction personnel.
    • Material Preparation: Purchase steel, wall materials, sanitary ware, electrical equipment, etc., and strictly inspect specifications, models, and quality.
    • Equipment Preparation: Debug lifting, welding, cutting equipment, and tools such as electric drills and wrenches to ensure good performance.
    • Site Preparation: Clear the site, level the ground, set up drainage facilities, divide the construction area, connect water and electricity, and set up safety warning signs.
  2. Foundation Construction

    • Set out lines according to the installation position and pour a concrete foundation (thickness ≥ 200mm, strength grade ≥ C20), with a curing time of no less than 7 days.
  3. Main Structure Installation

    • Weld the steel frame: First install the bottom rectangular frame and fix it to the foundation, then weld the vertical columns, and finally connect the top frame to form an overall structure.

II. Installation of Modular Steel Structure Mobile Toilets for Construction Sites

  1. Construction Preparation

    • Technical Preparation: Check the drawings against the on-site dimensions, establish a 3D model to simulate construction, prepare process manuals, and train personnel.
    • Material Preparation: Prepare light steel frames, exterior wall panels, toilet fixtures, waterproof membranes, etc., and clarify specifications and parameters.
    • Site Preparation: Level the site and set up drainage slopes, divide material storage, processing, and lifting areas, and complete foundation construction (including excavation of foundation pits, reinforcement binding, and concrete pouring).
  2. Main Construction Steps

    • The foundation work must complete reinforcement binding and concrete pouring according to design requirements. Subsequent steps usually include module lifting, assembly, sealing treatment, and installation and commissioning of internal facilities, which must strictly follow design specifications.

III. Installation of Bus-Mounted Mobile Toilets

  1. Demand Assessment: Determine equipment specifications and quantities based on the number of users, duration, site conditions, and environmental requirements.
  2. Transportation Planning: Plan transportation routes and methods in combination with the terrain and road conditions in Lvliang to ensure that equipment dimensions and weights comply with restrictions.
  3. On-Site Installation
    • Ensure that the equipment is level and stable and safely connect water and electricity interfaces.
    • Integrate internal units: Install squat/seat toilets, sinks, lighting, ventilation systems, and freshwater and wastewater tanks; high-end models require additional barrier-free facilities, maternal and child care tables, environmental monitoring sensors, etc.
    • Flexibly choose power supply options: external mains power, on-board generators, or solar panels.