The installation of simple mobile toilets in Linxia should follow standardized procedures and be technically adapted according to local environmental characteristics. The specific steps are as follows:

I. Pre-installation Preparation
- Site Selection: Prioritize hardened cement floors, asphalt floors, or compacted gravel floors to ensure a flat and solid surface. Avoid low-lying areas prone to water accumulation, geologically unstable areas, and areas at risk of falling objects. Reserve at least 1 meter of surrounding space for operation and maintenance, and ensure the slope is less than 5% to prevent internal water accumulation.
- Tool and Material Verification: Prepare tools such as a level, tape measure, and wrench, as well as gaskets, anchor bolts (for hardened floors), or anti-corrosion wooden strips/cement bricks (for non-hardened floor base platforms). After unpacking, verify that all components, including wall panels, roof covers, bases, doors, sanitary fixtures, pipes, and fasteners, are complete, with a special focus on checking easily damaged parts such as seals and connectors.
II. Main Structure Installation
- Base Platform Construction (Non-hardened Floors): Lay a rectangular frame matching the base size using anti-corrosion wooden strips or cement bricks, and adjust it to be completely level with a level to prevent subsequent structural deformation.
- Base Leveling and Fixing: Place the base on a hardened floor or base platform, measure the diagonals and four sides with a level, and adjust it to a level state by inserting gaskets of different thicknesses to ensure smooth door operation.
- Wall and Panel Assembly:
- Fix the side panels, rear panel, and base using embedded bolts or special connectors, gradually tightening the diagonals to avoid local stress concentration;
- Install the front panel and door frame, and fine-tune adjustable components to ensure squareness;
- Check the seals at all panel connections to ensure there are no gaps to prevent odor leakage.
III. Special Technical Adaptation for Linxia Region
- Material Selection: Use galvanized steel or aluminum alloy for the frame to enhance wind load resistance; select fiberglass or composite panels for the box body, with an internal coating that is slip-resistant, corrosion-resistant, and easy to clean; choose a sewage system based on the scenario, such as circulating water flushing, vacuum collection, or biodegradable (the latter is suitable for arid areas).
- Environmental Adaptability Optimization: Compact the foundation and test its bearing capacity to prevent uneven settlement; add insulation layers to pipelines to cope with low temperatures in winter; use a combination of solar photovoltaic panels and batteries for power supply, with the inclination angle adjusted according to the local latitude (e.g., for Linxia at about 35° latitude, an inclination angle of 30°-35° is recommended).
IV. Key Precautions
- Sewage pipe connections should use sealing rings or hot-melt welding to prevent leakage; biodegradable equipment requires monthly replenishment of bacterial agents, and vacuum collection equipment requires sewage tank removal every 2-3 weeks.
- The ventilation device should ensure an air exchange rate of at least 40 times per hour, and the lighting system should use 12-watt LED flat-panel lights equipped with photosensitive elements for automatic on/off control.
- The installation team must hold special equipment operation qualifications (e.g., for lifting and electrical wiring positions), and the product must have a quality inspection report from the housing and construction department (with a special focus on checking load testing, waterproof testing, and fire rating data).