Back to blog
Article

Kuitun Prefabricated Steel Structure Houses

Admin September 18, 2026

Here is the information about prefabricated steel structure houses in Kuitun:

Manufacturers and Contact Information: The main manufacturers of prefabricated steel structure houses in the Kuitun area include Urumqi Chengxin Color Steel Houses and Kuitun Wandun Steel Structure Co., Ltd. Urumqi Chengxin Color Steel Houses can undertake color steel house projects across Xinjiang, including in the Kuitun area. The contact person is Manager Li, with both mobile and fixed-line phone numbers being 15160999226. Kuitun Wandun Steel Structure Co., Ltd. provides services such as light steel villas, steel structure houses with integrated wall panels, and prefabricated buildings in Kuitun City, Xinjiang.

Price Information: The prices of prefabricated steel structure houses vary depending on their types and specifications. For example, the self-built light steel house with an arch-top steel structure factory building from Urumqi Xinshunda Steel Structure Co., Ltd. is priced at 230.00 yuan per square meter (≥1 square meter); the cost of a rural light steel villa (fully furnished) customized by Xinjiang Integrated Housing is 400.00 yuan per square meter (≥1 square meter); and the price of a quick-assembly house for homestays, light steel homestay integrated housing in Xinjiang, is 4600.00 yuan per set (≥10 sets). The light steel villa factory-built house in Yili from Kuitun Wandun Steel Structure Co., Ltd. is priced at 5500.00 yuan per square meter (≥1 square meter); the company's Urumqi container house assembly and movable housing in the Xinjiang Ili Kazakh Autonomous Prefecture is priced at 8500.00 yuan per unit; and the price of a Turpan light steel villa residential homestay mobile house, rural housing steel structure house in the Xinjiang Ili Kazakh Autonomous Prefecture is 800.00 yuan per square meter.

Steel Structure Project Developments in Kuitun City in 2026: In 2026, there are 47 steel structure-related projects in Kuitun City that are in the early-stage promotion, project approval, or construction preparation phases, representing a 22% increase compared to the same period in 2025. Among them, more than 60% of the projects are concentrated in three major directions: chemical equipment support, logistics and warehousing upgrades, and new energy equipment manufacturing factory buildings. In industrial factory building projects, 83% adopt single-story light steel structure systems, but higher requirements are placed on fire resistance ratings, corrosion resistance durations, and the adaptability of crane beam loads. Logistics and warehousing projects generally require single spans of ≥30 meters, eave heights of ≥12 meters, and construction periods compressed to within 90 days, favoring the 'factory prefabrication + on-site bolt assembly' model.