The installation of mobile toilets in Kaiyuan should follow the following procedures and precautions:

I. Pre-installation Preparation
- Site Planning: Survey the installation location in advance, avoiding hazardous areas such as low-lying areas with water accumulation and high-voltage power lines. Ensure that the width of the access passage is ≥1.2 meters and reserve operating space. If the installation area is subject to strong winds, evaluate the fixing method in advance.
- Materials and Tools: Verify the model and accessories of the mobile toilet (such as washbasins, sewage pipes, door locks, etc.), and check the appearance and internal facilities of the equipment for integrity. Prepare tools such as wrenches, screwdrivers, and spirit levels. If the main body of the toilet is heavy, coordinate with a crane for assistance in handling.
II. On-site Installation Steps
- Foundation Fixing:
- Hoist the main body of the toilet to the designated position and adjust it to a level state using a spirit level (deviation ≤3mm) to avoid structural tilting due to uneven ground.
- Fix the equipment using expansion bolts or counterweights to ensure stability, especially in areas with strong winds where additional fixing measures are required.
- Water and Electricity Connection:
- Connect the sewage pipe to the sewer or sewage collection tank, ensuring a pipe slope of ≥2% to prevent backflow of sewage. If a sewage collection tank is used, reserve a cleaning passage.
- Connect to the water source (it is recommended that the water pipe diameter be ≥DN20), test the flushing function and drainage sealing to ensure no leakage.
- Detail Adjustment:
- Install accessories such as door curtains and anti-slip mats, and check the flexibility of door locks and flush buttons to ensure smooth use.
- Clean and disinfect the interior, place consumables such as toilet paper and air fresheners to enhance the user experience.
III. Post-installation Acceptance
- Function Testing:
- Press the flush button three times continuously to confirm smooth drainage without blockage.
- Step on the top of the equipment to test structural stability, ensuring no shaking or abnormal noise.
- Delivery Documents: Provide the customer with an Equipment Installation Acceptance Certificate, indicating the installation date, warranty period, and usage instructions, and clarify subsequent maintenance responsibilities.
IV. Cost and Safety Regulations
- Cost Reference: The basic installation cost for an ordinary mobile toilet is approximately 500-2000 yuan. An additional transportation fee of 500-2000 yuan may be charged for remote areas. For complex terrain or high-altitude hoisting, additional labor costs need to be evaluated.
- Safety Regulations: Installation is prohibited in windy weather (≥5 levels). Safety harnesses must be worn for high-altitude operations. Warning signs should be set up in the construction area, and lighting equipment should be provided for night construction.
It is recommended to contact the supplier according to actual needs to obtain an accurate quotation and clarify whether transportation and basic installation services are included.