The installation of mobile toilets in Weishi, Kaifeng, should follow the following procedures and standards:

I. Pre-installation Preparations
- Site Survey and Planning: Confirm the installation location with the customer in advance, avoiding low-lying areas prone to water accumulation, high-voltage lines, and obstacles. When measuring the site dimensions, ensure that the width of the toilet access passage is ≥1.2 meters and reserve operating space.
- Material Inventory and Inspection: Upon arrival, verify the quantity, model, and accessories (such as washbasins, flushing devices, sewage pipes, etc.) of the mobile toilets. Check that the equipment is undamaged externally and that the internal facilities are intact to avoid installation delays due to material issues.
- Tool and Personnel Preparation: Equip with tools such as wrenches, screwdrivers, and spirit levels, and arrange for 2-3 professional installers. If the toilet is large or the installation environment is complex, coordinate with equipment such as cranes to assist with handling.
II. On-site Installation Steps
- Foundation Fixing: After hoisting the toilet body to the designated location, use a spirit level to adjust the equipment to be level, with a deviation not exceeding 3mm. In areas with strong winds, secure the equipment with expansion bolts or counterweights to prevent tipping.
- Water and Electricity Connection and Debugging: Connect the sewage pipe to the nearest sewer or designated sewage collection tank, ensuring a pipe slope of ≥2%. Connect to the water source (it is recommended to use a water pipe ≥DN20), test the flushing function and drainage tightness to avoid leaks or blockages.
- Detail Inspection and Cleaning: Install accessories such as door curtains and anti-slip mats, and check that the door locks and flush buttons are flexible. Clean and disinfect the interior, and place consumables such as air fresheners and toilet paper to enhance the user experience.
III. Post-installation Acceptance and Delivery
- Function Test Checklist: Conduct a flushing test (press the flush button 3 times continuously to ensure smooth drainage without blockage) and a load-bearing test (evenly step on the top of the equipment to check structural stability) to confirm that the equipment is operating normally.
- Delivery Document Confirmation: Provide the customer with an Equipment Installation Acceptance Certificate, indicating the installation date, warranty period, and usage instructions, clarifying the responsibilities and rights of both parties.
IV. Precautions and Safety Standards
- Installation Safety Requirements: When working at heights, a safety harness must be worn, and installation is prohibited in windy (≥Level 5) weather. Keep away from fire sources, and smoking or using open flame equipment inside the toilet is prohibited to prevent fire risks.
- Construction Site Management: Designate the construction area and set up warning signs to prevent unauthorized personnel from approaching. For night construction, provide adequate lighting and install reflective strips on the edges of the equipment to enhance visibility.
Special Information for Weishi Area: Products such as mobile houses, movable panel houses, and mobile toilets in Weishi are provided by Jinhua Xin'an Steel Structure Engineering Co., Ltd., which supports customized design solutions covering design, production, sales, and installation services to meet diverse needs.