Back to blog
Article

Jiangmen Prefabricated Housing Finished Products

Admin September 18, 2026

The finished prefabricated housing products in Jiangmen mainly adopt a modular construction model, achieving efficient construction through factory prefabrication and on-site assembly. Here is a detailed introduction:

1. Core Model and Industrial Thinking
Jiangmen's prefabricated housing is centered around modular construction, breaking down buildings into independent modules (such as walls, floors, stairs, etc.). Structural manufacturing, pipeline embedding, and decoration processes are completed in the factory, and then transported to the construction site for assembly. This model draws on the industrial thinking of container manufacturing. For example, since 2004, CIMC Industrial Park has applied special container production technology to the construction field, achieving the industrial transformation of building products through standardized design, assembly-line production, and mechanized transportation. Its prefabrication rate can reach 98% (such as the Hong Kong student apartment project), significantly improving construction efficiency.

2. Typical Enterprises and Technical Advantages

  • CIMC Industrial Park: Located in Da'ao Town, Xinhui District, it is the world's largest production base for special containers, with business covering more than 20 countries. Project types include high-end senior living apartments, polar hotels, office buildings, etc. Its technical advantages lie in high prefabrication rates and adaptability to extreme environments. For example, the hotel modules designed for Iceland's polar climate need to meet special requirements such as wind resistance, thermal insulation, and snow prevention; the modules provided for Saudi Arabia's Belt and Road projects need to adapt to high-temperature desert environments.
  • CSCEC Hailong 'Super Factory': Located in Shadui Town, Xinhui District, it delivers 12,000 steel boxes and concrete MiC (Modular Integrated Construction) modules annually. Its production model is similar to an automobile manufacturing assembly line, where workers produce building 'components' through standardized processes and ensure structural stability through precise assembly techniques (such as laser positioning and bolt connections). For example, in the Guangdong Shenzhen affordable housing project, five nearly 100-meter residential buildings were assembled from 6,028 concrete modules, reducing the construction period from 2.5-3 years to 1 year and cutting on-site labor by 50%.

3. Application Scenarios and Benefits
Jiangmen's prefabricated housing has been widely used in residential, apartment, hotel, office building, and other fields, especially suitable for projects with high requirements for construction period, cost, and quality. For example, the Hong Kong talent apartment project achieved a 114% increase in construction speed and a 71% reduction in labor costs through modular construction. In addition, modular construction excels in environmental protection and safety: factory production can reduce construction waste by more than 80%, and on-site assembly reduces the risk of high-altitude operations, aligning with the trend of green building development.