The construction of a container house requires following key steps such as design, approval, production, and installation, combining modular design and steel structure characteristics to achieve efficient construction.

I. Preliminary Preparation and Design

  1. Site and Approval
    It is necessary to clarify the land nature: For rural homesteads, construction approval is required, and a structural drawing stamped by an engineer should be provided. Construction on cultivated land and basic farmland is strictly prohibited. Leased land is mostly for temporary use, and the contract should clearly specify the nature of use. Container houses belong to steel structure buildings, not simple movable board houses, and unauthorized construction may be identified as illegal construction.
  2. Demand Planning
    Measure the site scope, the distance from neighbors, the dimensions and height of existing buildings, and consult the local planning department about the allowable height for construction along the street and the location of road red lines. Clarify functional requirements (such as bedrooms, living rooms, garages, etc.), and formulate a budget and construction schedule plan.
  3. Modular Design
    Based on standardized containers (e.g., a 20-foot container can bear a load of 25 tons, and a 40-foot container can bear a load of 45 tons), expand the space through container combination. The design focuses on integrating the site flow lines and the relationship between new and old buildings, rather than simply modifying a single container.

II. Production and Transportation

  1. Factory Prefabrication
    The manufacturer completes processes such as steel structure welding, wall panel composite processing (e.g., rock wool sandwich panels for fire prevention and heat insulation), and pre-embedding of water and electricity pipelines according to the detailed drawings. Modular design supports rapid disassembly and assembly, reducing on-site wet operations.
  2. Transportation and Acceptance
    Before the components are transported to the site, a trial assembly is required to ensure that the components match correctly. Concrete foundation pads or iron pads can adjust the elevation of the support frames to ensure connection fit and air tightness.

III. On-site Installation

  1. Foundation Construction
    Pour concrete foundation pads to isolate accumulated water and level the support frames. Leveling the site is crucial to avoid structural deformation.
  2. Module Lifting and Assembly
    Use professional trailers to lift the container modules and fix them with bolts or welding. For multi-story or row buildings, it is necessary to confirm that the manufacturer has the ability to handle waterproof nodes to prevent leakage.
  3. Pipeline Connection and Decoration
    Connect the water and electricity pipelines and install doors, windows, and internal facilities. Light steel keel houses are suitable for long-term use scenarios (such as homestays) and can be flexibly customized in terms of appearance and house type.

IV. Acceptance and Maintenance

  1. Safety Inspection
    Focus on inspecting the welding quality of the steel structure, anti-corrosion treatment (such as galvanizing or spraying), and load-bearing capacity. The service life depends on the materials and craftsmanship, and high-quality container houses can last for more than 15 years.
  2. Later Maintenance
    Regularly inspect waterproof nodes, pipeline aging, and structural stability. Modular design supports relocation and reorganization, reducing the cost of repeated construction.