Hongsipu Prefabricated Assembly Housing
Hongsipu District has established a development foundation in the field of prefabricated assembly housing that combines policy guidance, corporate supply, and project practice. However, specific cases require further verification regarding the use of prefabricated components, and the overall market potential is significant.

Clear Policy Support Drives the Popularization of Prefabricated Buildings
According to the "Implementation Plan for Vigorously Developing Prefabricated Buildings" issued by Wuzhong City in 2017, Hongsipu District, as a jurisdiction, is required to implement the following requirements:
- Mandatory Application Scope: Government-invested public welfare buildings (such as schools and hospitals), public buildings (such as airports and stations), and affordable housing projects must adopt prefabricated construction methods;
- Encouraged Promotion Areas: Large-scale residential communities and commercial projects invested by society should promote prefabricated technology according to local conditions.
This policy provides top-level design support for the development of prefabricated assembly housing in Hongsipu District, ensuring that public projects prioritize standardized and efficient construction methods.
Local Enterprises Possess Technical Capabilities, with Products Covering Multiple Scenarios
Yinchuan Xuyi Steel Structure Color Plate Co., Ltd., as a representative enterprise in the Ningxia region, has outstanding production capabilities for prefabricated houses:
- Product Types: Including color steel plates, steel structures, and movable houses, supporting integrated services from design, production to installation;
- Technical Parameters: Container movable houses are assembled using a modular approach, with a service life of up to 30 years, a snow load capacity of 500kg/m², and wind resistance of 5km/h, suitable for construction sites, temporary housing, and other scenarios;
- Project Experience: It has undertaken industrial plants, commercial buildings, etc., demonstrating its technical maturity and large-scale production capacity.
Such enterprises provide localized supply chain support for Hongsipu District, reducing transportation costs and shortening construction periods.
Project Practice Shows Initial Success, with Obvious Characteristics of Standardized Management
In the Boai Home Project in Longquan Village, Dahe Township, Hongsipu District (approved in 2025), the newly built selenium melon sorting workshop (317.99㎡) and ancillary facilities, although not explicitly labeled as prefabricated buildings, implement the "four systems" management (project legal person system, bidding system, supervision system, and contract management system), which is highly consistent with the standardized management requirements of prefabricated buildings. This indicates that the region has integrated the standardized processes of prefabricated buildings into project implementation, laying a foundation for subsequent technological upgrades.
Clear Green Development Goals, with Market Potential to be Unleashed
The 2023 work priorities for urban and rural green development in Hongsipu District propose:
- Proportion of Prefabricated Buildings: The proportion of prefabricated buildings in newly constructed buildings should reach over 10%;
- Coverage Rate of Smart Construction Sites: Large-scale projects should achieve 100% coverage.
This goal will drive the transformation of prefabricated assembly housing from policy requirements to spontaneous market demand, especially in areas such as affordable housing and commercial complexes, where standardized and environmentally friendly construction methods will become mainstream choices.




