Haian Mobile Toilet Production
Mobile toilet production in Haian can be customized by professional companies or carried out step-by-step by individuals. Here is a detailed introduction:

Customization by Professional Companies
Nantong Shengduo Metal Products Co., Ltd. offers mobile toilet manufacturing, leasing, sales, and after-sales services. The company specializes in products such as prefabricated mobile public toilets and eco-friendly public toilets, and can provide customized designs based on customer needs. Its service process covers one-stop steps including demand communication, drawing confirmation, mold opening and production, sample confirmation, mass production, delivery, and after-sales service. Customers only need to present specific requirements, such as the size, functions, and usage scenarios of the toilets, and the company's professional team will engage in in-depth communication with the customers to determine the design plan. Subsequently, production will be carried out strictly in accordance with the process to ensure that the final product meets customer requirements.
Cangzhou Hengtai Sanitation Equipment Co., Ltd. also provides customized mobile toilet and restroom production services for scenic spots in Nantong.
Steps for Self-Production
- Tool and Material Preparation: Tools required include electric welding machines, wrenches, saws, cutting machines, etc. Materials include stainless steel plates, water pipes, electrical wires, faucets, water tanks, light bulbs, toilets, switches, etc.
- Plate Cutting: Cut the stainless steel plates into four equally sized rectangles to serve as walls. Cut a small rectangle from one of the wall plates to serve as a door panel. Cut a small rectangle from the upper part of the wall plate opposite the door for window installation. Cut a bottom plate for the floor and another plate for the ceiling.
- Structural Welding and Door/Window Installation: Weld the cut plates together using a welding machine to form the overall external structure of the toilet and restroom. Install a door lock on the door panel and connect the door panel to the wall plate using door hinges. Install the prepared glass window on another wall.
- Water and Electricity Installation: Connect water and electricity from the outside and reasonably determine the positions of water pipe openings and electrical wire ends. Install a light bulb socket on the top of the toilet and restroom and install a light bulb. Lead the water pipe to the side of the toilet and install a faucet.
- Sewage Disposal and Water Storage Setup: Raise the floor at the bottom of the toilet and restroom and place a sewage collection tank in the interlayer, aligning the opening of the sewage collection tank with the sewage outlet of the toilet. Then install the toilet to ensure that the sewage collection tank is not visible from the floor. The water storage tank can be installed on the upper part of the toilet and restroom to save space.
- Exhaust and Mobility Setup: Reserve an exhaust port or install an exhaust fan. Install wheels at the bottom of the toilet and restroom floor for easy mobility.




