Gejiu Mobile Toilet Installation
For the installation of mobile toilets in Gejiu, you can refer to the following general steps and precautions. For specific plans, it is recommended to consult a professional team based on the local environment:

I. Pre-installation Preparations
Site Survey
Determine the installation location in advance to ensure that the ground is flat and solid, avoiding main construction roads, low-lying waterlogged areas, and pollution sources (such as septic tanks and garbage dumps). Gejiu has a subtropical mountain monsoon climate with concentrated rainfall during the rainy season. The site should have a certain drainage slope to prevent water accumulation from affecting the stability of the toilet.Material and Tool Preparation
Check whether the mobile toilet cabinet is intact and verify the list of accessories (such as door locks, flush valves, sewage pipes, anti-slip mats, etc.). If any damage is found, contact the supplier promptly for replacement. Equip with tools such as wrenches, screwdrivers, and spirit levels. If the toilet is large in volume or installed at a high position, coordinate with lifting equipment such as cranes and forklifts to assist with handling.Personnel and Safety Planning
Arrange professional installation personnel and clarify the division of labor (such as water and electricity connection, cabinet fixation, etc.). If working at heights (such as roof installation) is involved, safety harnesses and fall arresters should be provided. Construction is prohibited in windy weather of force 5 or above to avoid accidents caused by cabinet shaking.
II. On-site Installation Steps
Foundation Treatment
Clear ground debris according to the type of toilet, lay 10-15 cm thick gravel or pour C20 concrete foundation to ensure a bearing capacity of ≥300 kg/m² (refer to the standard for ordinary mobile toilets). The geology in Gejiu is mainly karst landform. If soft soil or rock strata are encountered, the foundation should be reinforced or the installation depth adjusted.Cabinet Placement and Fixation
Use a crane to lift the toilet body smoothly to the designated position, adjust it to a level state with a spirit level, and apply waterproof glue at the contact surface between the bottom and the foundation to prevent water seepage. If it is a multi-toilet combined toilet, connect each cabinet with bolts and reinforce them.Drainage and Water and Electricity Connection
Connect the sewage pipe to the construction site drainage system or a temporary sump. Wrap the joint with Teflon tape and apply sealant to prevent leakage. After connecting the water source, test the flushing function. Press the flush button three times continuously and observe whether the drainage is smooth. If electrical equipment (such as intelligent sensor flushing) is used, connect it to a 380V three-phase power supply and install a leakage protection device.
III. Post-installation Acceptance and Delivery
Function Testing
Conduct a load-bearing test (evenly step on the top of the equipment for 10 minutes to check for structural deformation) and a sealing test (inject water into the toilet bowl and observe whether there is leakage at the sewage pipe joint). After passing the acceptance, provide the customer with an Equipment Installation Acceptance Certificate, indicating the installation date, warranty period (usually 1 year), and usage precautions (such as prohibiting the pouring of debris and regular cleaning).Restoration of the Construction Area
Remove warning signs, clean up construction waste generated during installation, and restore the site to its original appearance. If installed in a public area, coordinate with the urban management department to confirm whether it complies with municipal planning requirements.
IV. Special Precautions for the Gejiu Area
- Climate Adaptability: Prepare waterproof cloth to cover the cabinet during rainy season construction to prevent rainwater from seeping into the circuit. In summer, ventilation equipment should be installed inside the toilet to prevent odor accumulation.
- Geological Adjustment: If the installation site is located on a hillside or rock stratum area, conduct a geological survey in advance and use anchor rods to reinforce the foundation if necessary.
- Customized Services: Contact local rental teams in Gejiu (such as the Gejiu Environmental Sanitation Equipment Company) to obtain installation plans tailored to the local environment (such as moisture-proof treatment and wind-resistant design).
You may also like

Portable Toilet Eco-Friendly Custom & OEM: Design & Bulk Production Guide
Read More
How to Assemble & Install Container House Step by Step
Read More
Portable Toilet Eco-Friendly in 2026: Buying Guide & Recommendations
Read More