Back to blog
Article

Customized Mobile Toilet Rental Contract

Admin October 08, 2026

Here is a template for a customized mobile toilet rental contract for your reference:

Contracting Parties Information Party A (Lessor): The name, address, contact person, and contact number must be clearly filled in. Party B (Lessee): The name, address, contact person, and contact number must be clearly filled in.

I. Description of Rented Items

  1. Equipment Type and Quantity: The type of mobile toilet (such as standard environmentally friendly type, barrier-free type, etc.), quantity, and additional equipment (such as sinks, septic tanks, etc.) must be clearly specified. Both parties shall jointly confirm and record the initial condition of the equipment to avoid disputes upon return.
  2. Equipment Condition Confirmation: Before delivery, the functional integrity of the equipment (such as flushing, ventilation, and sewage systems) must be inspected, and a written record shall be kept.

II. Rental Period

  1. Start and End Dates: The start and end dates of the rental must be clearly specified, and the total number of days must be accurately calculated.
  2. Renewal Terms: Party B must notify Party A in writing of its renewal request 3-7 days in advance. If no notice is given, Party A has the right to reclaim the equipment.

III. Delivery and Installation

  1. Site Requirements: Party B must ensure that the installation site is level and obstacle-free and provide necessary assistance such as power access.
  2. Delivery Time: The specific date and time point must be clearly specified. The installation cost is included in the total rent and no additional charges shall be levied.

IV. Rent and Payment Method

  1. Total Rent and Installments: The total amount, down payment ratio (such as 30%-50%), and final payment deadline (such as within 3 days after installation completion) must be clearly specified.
  2. Late Payment Penalty: For overdue payments, a late payment penalty of 0.1%-0.5% per day must be paid, and the specific ratio can be negotiated.

V. Service Content

  1. Party A's Responsibilities: Party A is responsible for equipment transportation, installation, commissioning, and maintenance during the rental period to ensure the normal operation of the equipment.
  2. Party B's Responsibilities: Party B shall regularly empty the septic tank and carry out environmental protection deodorization treatment. If the operation cannot be carried out due to obstacles on Party B's site, it shall still be counted as one service.

VI. Responsibilities of Both Parties

  1. Party A's Core Obligations: Party A shall guarantee the quality of the equipment and respond promptly to equipment failures for repair.
  2. Party B's Core Obligations: Party B shall pay the rent as agreed, shall not sublease or use the equipment in a different location, and shall compensate for any damage or loss at the market price.

VII. Other Terms

  1. Settlement Rules: If the rental period is less than 15 days, it shall be calculated on a half-month basis; if it exceeds 15 days, it shall be calculated on a monthly basis.
  2. Contract Effectiveness: The contract must be signed and stamped by both parties, with two copies, one for each party, and shall take effect from the date of signing.

Notes: The contract terms can be adjusted according to actual needs, such as adding insurance clauses, breach of contract compensation details, or response measures for special scenarios (such as extreme weather). It is recommended to have the contract reviewed by a legal advisor before signing to ensure its legality and compliance.