Renovation of Prefabricated Panel Houses in Changchun City
The renovation situation of prefabricated panel houses in Changchun City varies depending on the region and the condition of the houses. Some houses have been included in the renovation plan but have not yet started due to issues such as funding, while residents of some houses hope for assessment and renovation, and some houses have only undergone facility maintenance and repair.

Renovation Situation of the Bicycle Dormitory in Erdao District
The bicycle dormitory in Erdao District was built in 1979 and has a prefabricated panel structure. The house has problems such as cracks in the walls, exposed steel bars on the balcony, and aging indoor wiring, and has been included in the renovation plan for shantytowns in Changchun City. However, due to the impact of the epidemic and the overall downturn in the real estate market, the development and renovation entity is facing a shortage of funds, resulting in the delay of the expropriation work. Currently, relevant departments are actively urging the development enterprise to raise funds and providing policy support to fully promote the preparatory work before expropriation of the land. At the same time, efforts are being made to plan the area as a project for the renovation of urban villages, striving to start expropriation as soon as possible to improve residents' living conditions.
Renovation Situation of Yongchun Community in Youai Hutong, Nanguan District
Buildings 13 and 21 and surrounding buildings in Yongchun Community, Youai Hutong, Nanguan District, were built in the 1990s and are prefabricated panel houses with a service life of nearly 40 years. There are multiple cracks inside the buildings. Residents hope that the housing and urban-rural development bureau will pay attention to this matter and conduct assessments in a timely manner. However, the petition office of the housing management bureau replied that relevant issues should be consulted with the housing and urban-rural development bureau of the district, indicating that the renovation plan for this area has not yet been clarified, and residents need to further communicate with the housing and urban-rural development bureau of the district for understanding.
Renovation Situation of Building 8 in Changfang, Lvyuan District
Building 8 in Changfang, Lvyuan District, is a prefabricated panel house that has been in use for more than 50 years. All pipelines are exposed, posing safety hazards, and three households share one toilet, resulting in poor living conditions. Chuncheng Subdistrict has not received relevant policies regarding the demolition of prefabricated panel houses, but considering the actual situation, it has carried out maintenance and repair of facilities such as outdoor stairs, guardrails, and electrical circuits of the house to ensure the basic living safety of residents. At the same time, the subdistrict informed the reporter that they could apply to relevant departments for policies on renting public rental housing and low-rent housing, providing other housing options for residents.




