The installation of container houses in Zunyi requires selecting the installation method according to the specific type. Common types include assembled container panel houses, foldable container mobile houses, and fixed container houses. The installation process covers steps such as foundation preparation, frame construction, wall installation, and detail handling.

1. Installation of Assembled Container Panel Houses

  1. Foundation Preparation
    The operation should be carried out on a flat ground or a workbench. Connect the bottom corners of the container to the bottom beams with hexagon socket bolts, but do not tighten them temporarily. After adjusting the diagonal difference of the bottom frame to be ≤ 3mm, tighten the bolts.
  2. Secondary Beam and Floor Installation
    Install the π-shaped secondary beams according to the positioning holes of the long beams. Fix them with self-tapping screws and then lay the magnesium oxide board base plates. The floor should be laid along the centerline of the π-shaped beams, with the joints coinciding with the centerline. Fix them with cross-flat-head swallow-tail screws, with a nail spacing of 300 - 350mm.
  3. Floor Treatment
    Grind the joints of the floor as a whole, brush PVC special floor adhesive, lay the floor covering, and expel the air. If necessary, perform welding treatment on the joints.

2. Installation of Foldable Container Mobile Houses

  1. Frame Unfolding and Stabilization
    After checking the stability of the steel wire ropes, lift the main frame and unfold it smoothly. Place support rods in the middle of the container body to maintain stability.
  2. Wall Installation
    Push open one wall and fix it with tightening screws, then push open the other wall with doors and windows and tighten the screws.
  3. Lifting and Positioning
    Lift the folded container house to the predetermined position, confirm that there is no one around, and then lower it. The entire process requires professional operation, and non-staff should stay away from the installation area.

3. Key Points of Fixed Container House Installation

  1. Structural Advantages
    The fixed container house adopts an independent container structure. The floor materials are steel, cement, or tiles, with a thickness of more than 20 centimeters. Its sound insulation effect is better than that of mobile panel houses.
  2. Combination and Expandability
    Based on a standard steel chassis, it can be derived into spaces such as conference rooms, dormitories, and kitchens. The standard width is 2.4 meters, the height is 2.2 meters, and the length is 4 - 12 meters.
  3. Performance Characteristics
    It has the capabilities of earthquake resistance, deformation resistance, waterproofing, fire prevention, and corrosion prevention. The overall structure can be relocated as a whole, and its service life can reach more than 20 years.

4. Local Installation Service Resources in Zunyi

  1. Supplier Recommendations
    Guizhou Caikang Prefabricated Building provides more than 10 years of professional design and installation services, covering the whole of Zunyi. Zunyi Hongshun Steel Structure Co., Ltd. provides rental and sales services for foldable containers and flat containers.
  2. Service Scope
    It includes container houses, mobile panel houses, color-steel houses, sentry boxes, and mobile toilets. Some merchants provide services in areas such as Fenggang and Nanbai and offer platform certification guarantees.