Zigong Housing Container Installation

Quản trị 15 tháng 9, 2026

The installation of housing containers in Zigong should follow standardized procedures, combined with the operations of professional design and construction teams, focusing on foundation preparation, structural assembly, fixed connections, and acceptance checks. Here are the specific installation points:

I. Foundation Preparation and Site Requirements

Container installation should be carried out on a flat and solid ground to avoid structural deformation caused by foundation settlement. If the site has soft soil, a concrete foundation should be poured in advance or a workbench laid to ensure the levelness of the bottom frame. For example, when installing assembled container houses, the levelness should be adjusted by measuring the diagonal difference of the bottom frame (≤3mm), and then the inner hexagon bolts should be tightened to connect the container corners and the bottom beams. For foldable containers, the stability of the steel wire ropes should be checked, and the main frame should be kept stable during hoisting, with support rods placed in the middle of the container to maintain stability.

II. Structural Assembly and Connection Techniques

The structural assembly of containers should be carried out strictly according to the design drawings, with a focus on controlling the strength of connection nodes. Taking a standard homestay container (3.2×6m) as an example, its installation process includes:

  1. Bottom Frame and Secondary Beam Installation: Use inner hexagon bolts to connect the container bottom corners and the bottom beams, and do not tighten them temporarily; install π-shaped secondary beams according to the positioning holes of the long beams, and fix them with M5.5×19 self-tapping screws. The tops of the secondary beams and the bottom beams should be reinforced with ST4.8×16 round-head drill tail screws.
  2. Floor Laying: Lay magnesium oxide board base plates along the 6-meter direction, and splice them after cutting the corners according to the chalk lines; mark and snap lines on the midline of the π-shaped beams, align the floor splices with the midline, and fix them with ST4.2×38 cross-head dovetail screws, with a nail spacing of 300-350mm.
  3. Wall and Roof Installation: For foldable containers, first push open one wall and tighten the screws, and then install the walls with doors and windows; for packing-box units, special-shaped steel plates for the frame should be welded, and sound insulation and heat insulation materials should be filled before installing the side panels.

III. Safety Regulations and Acceptance Standards

During the installation process, safety operation procedures should be followed, and non-professionals are prohibited from entering the hoisting area. For example, when hoisting foldable containers, ensure that there is no one around before lowering the container. After the installation is completed, an acceptance check should be carried out, focusing on the following aspects:

  • Structural Stability: Check whether the diagonal error of the bottom frame and the tightening torque of the bolts meet the design requirements;
  • Sealing: Check whether the splicing joints of the floor rubber are welded to prevent rainwater leakage;
  • Functionality: Check whether the water and electricity lines are connected and whether the doors and windows open and close smoothly.

IV. Professional Teams and Customized Services

In the Zigong area, you can contact professional teams such as Sichuan Jinzhu Kaiyue Construction Engineering Co., Ltd. and Huize Integrated Housing that have professional qualifications. These teams have experienced installation personnel and advanced equipment, and can provide personalized design and customized solutions. For example, packing-box units can be stacked and combined up to three floors according to needs, with decorative roofs or terraces added; medical cabins adopt a separate design of the cabin body and the chassis, which can flexibly adapt to different scenarios.