Construction of Cement Prefabricated Houses in Zhengzhou
The construction of cement prefabricated houses in Zhengzhou adopts prefabricated building technology, which involves factory-produced prefabricated components and on-site hoisting and assembly. The construction plan covers key points such as project overview and construction preparation.

Project Overview: The construction projects of cement prefabricated houses in Zhengzhou are diverse, covering various types such as residential buildings, dormitories, and office buildings, with a maximum of 5 floors. The main structure is cast as a whole using C35 high-grade concrete and national standard threaded steel. This material combination ensures the robustness and stability of the houses. Their seismic performance meets the 8-degree standard, providing reliable safety protection for occupants in the face of natural disasters such as earthquakes. Meanwhile, the main structure comes with a 30-year quality warranty, giving users peace of mind.
Construction Preparation:
- Site Preparation: Before construction, clear obstacles such as debris, trees, and stones from the site to ensure a flat surface. Test the soil bearing capacity and reinforce the foundation if the bearing capacity is insufficient to ensure the stability of the house foundation. Set up fences with a height of no less than 2.5 meters, with conspicuous safety warning signs on the outside and warning lights at night to ensure construction safety. When setting up temporary facilities, choose locations away from hoisting operation areas and high-voltage lines, and comply with fire safety regulations. Plan the access roads for construction vehicles and material transportation routes, with a road width of no less than 4 meters, poured with C20 concrete and a thickness of no less than 15 centimeters, to facilitate the transportation of construction vehicles and materials.
- Technical Preparation: Organize design, construction, and supervision units to conduct drawing reviews to ensure that all parties have a clear understanding of the design intent and construction requirements. Prepare a detailed construction plan, including construction procedures, hoisting processes, quality assurance measures, safety assurance measures, and progress schedules, to provide comprehensive guidance for construction. The project technical leader shall conduct technical disclosures to the construction teams to familiarize the construction personnel with the construction processes and operating points. Conduct on-site surveying and setting out according to the design drawings and planning red lines to ensure accurate positioning of the houses.
- Material and Equipment Preparation: Use C35 high-grade concrete for the concrete. Select P.O 42.5 ordinary Portland cement for the cement. Use medium sand for the sand, with a mud content of no more than 3%. The crushed stone has a particle size of 5 - 20 millimeters, with good grading and a mud content of no more than 1%. Select HRB400E threaded steel for the steel bars. The selection of these materials meets the quality requirements for house construction.