Quay lại blog
Bài viết
Wuqing Container-Style House Installation
Quản trị 15 tháng 9, 2026
For the installation of container-style houses in Wuqing, you can contact Falilai Prefabricated Construction (Tianjin) Co., Ltd. or Jinhua Xin'an Steel Structure Engineering Co., Ltd. The installation steps include frame erection, wall panel installation, partition and internal corner installation, and window installation, among others. Here is the specific information:

I. Recommended Installation Companies
Falilai Prefabricated Construction (Tianjin) Co., Ltd.
- Address: No. 86-1, Fuxing Road, Xiazhuzhuang Street, Wuqing District, Tianjin
- Main Products: Packing-box units, container houses, residential containers, modular houses
- Services: Provides a one-stop service covering design, research and development, production, sales, installation, and after-sales support. Committed to the development and application of container houses, the products boast advantages such as energy efficiency, environmental friendliness, quick installation, flexible combination, and durability.
Jinhua Xin'an Steel Structure Engineering Co., Ltd.
- Service Scope: Specializes in the design, production, sales, and installation of mobile homes, containers, and movable panel houses, offering a one-stop service.
- Product Applications: Widely used in construction sites, municipal engineering projects, parks, scenic spots, and other infrastructure construction sites, providing dormitories and offices, etc.
II. Installation Steps
Taking a packing-box-style house as an example, the installation steps are roughly as follows:
- Frame Erection: Simply attach the four columns to the base plate with screws, then place the top plate on top and install the downspouts. Ensure the ground is level and the diagonal dimensions are consistent. Adjust the outer edges of the columns to be perpendicular and flush with the outer edges of the top and base frames before securing the bottom and top screws.
- Wall Panel Installation: Carefully examine the drawings and install according to the codes marked on them. The flat edges of the wall panels should be on the inside, and the镶嵌口 (not sure about the exact English term, maybe 'recessed edges') should face outward. When joining, use steel strips to clamp at the虎口 (not sure about the exact English term, maybe 'notches'). Be careful not to tear the panels with excessive force.
- Partition and Internal Corner Installation: First, use blind rivets to fix the corner aluminum for the partition panels on one side, then install the entire wall panels, door side panels, and door head panels, etc. Cut the corresponding corner aluminum according to the internal dimensions for internal corner installation.
- Window Installation: First, install the window frame aluminum, then install the windows and adjust and secure them.




