Quay lại blog
Bài viết

What to Do After Prefabricated Housing

Quản trị 18 tháng 9, 2026

After prefabricated housing, there are primarily two directions based on different scenarios and needs: modular building assembly and renovation of old prefabricated panel houses.

Modular Building Assembly

After being manufactured in the factory, prefabricated housing modules are transported to the construction site for assembly. This construction model offers significant advantages:

  • Shortened Construction Period: The construction period can be reduced by over 60%. For example, the completion and delivery time for a public housing project in Shenzhen was shortened from the traditional 2.5 to 3 years to just 1 year, while a renovation project for dilapidated buildings in Beijing achieved roof sealing in just 3 months.
  • Quality Control: Factory production allows for strict control over material quality, construction techniques, and precision, reducing on-site construction errors and enhancing overall building quality.
  • Energy Efficiency and Environmental Protection: Centralized factory production reduces on-site construction waste and dust pollution, while optimizing material usage to lower energy consumption.
  • Ease of Maintenance: Modular design facilitates later maintenance and replacement of components, extending the building's service life.

Renovation of Old Prefabricated Panel Houses

For old prefabricated panel houses already in use, the renovation approach should be selected based on the building's condition and policy requirements:

  • In-situ Renovation: For buildings that can continue to be used and renovated, carry out repairs, reinforcement, and functional upgrades, such as seismic reinforcement, wall repairs, replacement of sewer pipes, roof waterproofing renovation, etc. Additionally, elevators may be installed and corridor environments improved to enhance living comfort.
  • Demolition and Reconstruction on the Same Site: For old buildings that cannot be effectively repaired through general maintenance, demolish them and rebuild on the same site to meet modern living needs.
  • Reinforcement and Renovation: If the building is classified as Grade C (the main structure can still be reinforced and repaired), carry out seismic reinforcement, wall repairs, and other renovations. Most of the renovation costs are subsidized by the government, reducing the burden on homeowners.
  • Relocation and Resettlement After Demolition: If the building is classified as a Grade D dilapidated house or the area is included in urban renewal plans, homeowners can choose to be relocated and resettled on the same site or nearby, with new buildings exchanged based on the original property certificate area to safeguard their living rights.
  • Direct Monetary Compensation: When the building is expropriated and demolished, homeowners can also choose not to opt for resettlement housing but instead receive direct monetary compensation, allowing for flexible asset management.

Different renovation approaches should be comprehensively decided upon by considering the building's condition, policy requirements, and homeowner preferences to ensure safety, economy, and suitability.