Quay lại blog
Bài viết

Wenzhou Prefabricated Panel Housing

Quản trị 18 tháng 9, 2026

Wenzhou's prefabricated panel housing faces numerous issues, but is actively exploring solutions.

Existing Problems:
Some prefabricated panel houses in Wenzhou, built many years ago, pose serious safety hazards. Taking Hongyuan Community in Yueqing City as an example, this community, constructed in 1986, was among the first batch of commercial housing in the area, utilizing a prefabricated panel structure. After long-term use, the houses have developed problems such as wall cracking and water seepage. Moreover, the prefabricated panel structure leads to recurring water leakage, with limited repair effectiveness. Additionally, the community lacks elevators and parking spaces, making it difficult for the elderly to go up and down the stairs. The narrow fire lanes prevent fire trucks from entering, creating fire safety hazards. In 2015, the community was classified as a Class C dilapidated building, and in 2025, it was upgraded to Class D, indicating a severe lack of structural safety.

Solutions:
In response to the issues with prefabricated panel houses, Wenzhou is exploring solutions through a combination of policy support and resident-initiated renovations. After the implementation of policies from 2024 to 2025, Yueqing City designated Hongyuan Community as a pilot project for self-initiated renovations. All 52 homeowners signed up, raising 10.1 million yuan (less than 200,000 yuan per household) through self-financing to complete the reconstruction. The costs covered demolition, design, construction, elevator installation, and pipeline renovations. The reconstructed community is planned to have two buildings with elevators, with the ground-level架空层 (open-air floor, here translated as 'ground-level open space' for clarity in context, though a more precise architectural term might be used based on specific design) designated as parking garages, basically providing each household with a fixed parking space. The average building area per household has increased by about 7.6 square meters, and the average internal area has increased by 1.6 square meters, significantly improving living conditions. The project is expected to be completed in June 2027.

Policy Support:
The '15th Five-Year Plan for Urban Renewal' issued by the State Council in May 2026 clearly proposes supporting the self-initiated renovation and original-site reconstruction of old housing, and exploring sustainable operation models. This policy provides a top-level design basis for the renovation of prefabricated panel houses in Wenzhou, promoting the resolution of historical issues through a resident-led and government-guided approach, while also offering replicable experience for similar housing renovations across the country.