Tianjin Container House Installation

Quản trị 16 tháng 9, 2026

The installation time of container houses in Tianjin varies depending on the brand and type. The installation of ordinary container houses takes 5 hours, while packing-box units can be used immediately after on-site hoisting. The specific installation process should follow professional steps and reliable manufacturers should be selected.

Installation Time Differences

There are significant differences in the installation times of container houses of different brands and types. For example, the installation of ordinary container houses from Tianjin Yufada takes 5 hours, and the layout is fixed and cannot be adjusted. The packing-box units from Suzhou Zhongnan have completed interior decoration and facility pre-installation before leaving the factory and can be put into use immediately after on-site hoisting, which is suitable for long-term on-site projects and can greatly shorten the installation time. The installation of a single set of standard container houses from CIMC takes 3 hours, but the layout adjustment is limited; the installation of quick-assembly container houses from Yazhi takes 4 hours and only supports basic assembly.

Key Points of the Installation Process

Taking the packing-box houses of Farillee Modular Construction (Tianjin) Co., Ltd. as an example, its installation process includes several key steps:

  • Erecting the Frame: Install four columns on the base plate, place the top plate and install the downspouts. It is necessary to confirm that the ground is level and the diagonal dimensions are consistent, adjust the verticality of the columns, and then fix the screws.
  • Installing Wall Panels: Install the wall panels according to the codes marked on the drawings. Note that the flat openings should face inward and the镶嵌口 (inlaid openings) should face outward. When assembling, use steel strips to fix the tiger-mouth parts to avoid tearing the panels. If the gaps are large, use pull rivets to re-fix them.
  • Installing Partitions and Windows: First, fix the corner aluminum with pull rivets, install the whole wall panel, then install the small side panel of the door and the door head panel, and then install the channel aluminum at the door frame; the window frame aluminum should be fixed at a 45-degree angle on the composite panel, and after installing the window, adjust it and fix it with self-drilling screws.

Recommended Reliable Manufacturers

There are several professional manufacturers in Tianjin engaged in the installation of container houses. For example, Changhong Integrated Housing Manufacturer has a professional production and installation team, providing one-stop services from design, production to installation, and selects high-quality materials to ensure product quality. Farillee Modular Construction (Tianjin) Co., Ltd. is also a reliable choice. Its products include packing-box units and container houses. The company has multiple departments and provides comprehensive services. It has established long-term strategic cooperative relationships with many domestic construction units.