Construction Time of Prefabricated Houses in Shanghai
The construction time of prefabricated houses in Shanghai generally follows the general regulations for construction time on construction sites in Shanghai, that is, the normal construction period is from 6:00 to 22:00 every day, and this time period also applies on weekends and holidays; construction is prohibited in principle from 22:00 to 6:00 the next day, and special circumstances require application and noise reduction measures.

Normal Construction Period
The construction time of prefabricated houses in Shanghai is the same as that of ordinary construction sites, with a legal construction period from 6:00 to 22:00 every day. This regulation applies to weekdays, weekends, and holidays, covering the entire process of prefabricated houses from foundation construction to main body installation. For example, key processes such as the lifting and splicing of prefabricated components are usually completed during this time period to ensure a balance between construction efficiency and the lives of surrounding residents. It should be noted that the construction party must strictly comply with the requirements for daytime noise limits in the "Regulations of Shanghai Municipality on the Prevention and Control of Environmental Noise Pollution" to avoid excessive noise caused by mechanical operations and material transportation.
Prohibited Construction Period
The period from 22:00 every day to 6:00 the next day is a prohibited construction period, but there are exceptions:
- Special Operation Application: If nighttime construction is required due to emergency repairs, emergency rescues, or process continuity requirements (such as concrete pouring), the construction party needs to apply for a "Nighttime Construction Permit" from the ecological and environmental department in advance and publicize the construction content, time period, and noise reduction measures around the construction site.
- Noise Reduction Measure Requirements: Projects approved for nighttime construction must take effective noise reduction measures, such as using low-noise equipment, setting up sound barriers, and limiting the duration of high-noise processes, to ensure that the nighttime noise does not exceed 55 decibels (standard for residential areas).
Supervision and Violation Handling
The Shanghai Municipal Commission of Housing and Urban-Rural Development and the ecological and environmental bureau supervise the construction time through on-site inspections and the networking of noise monitoring equipment. If the construction party fails to obtain a permit or fails to implement noise reduction measures, it will face warnings, fines (up to 100,000 yuan), or orders to suspend construction for rectification. Residents can complain about nighttime illegal construction through the 12345 citizen hotline or the local environmental protection department, and the relevant department needs to respond within 24 hours.
Impact of Prefabricated House Construction Characteristics
Due to the characteristics of components being prefabricated in factories and assembled on site, the construction period of prefabricated houses is usually shorter than that of traditional cast-in-place buildings, but processes such as lifting and splicing may still generate noise. Therefore, the construction party needs to optimize the process arrangement, for example, completing high-noise operations during the daytime and only carrying out low-noise auxiliary work at night to minimize the impact on the surrounding environment.