Residential Container House Processing

Quản trị 15 tháng 9, 2026

The processing of residential container houses involves multiple stages, including design, material selection, structural fabrication, functional system pre-embedding, and on-site installation. Details are as follows:

1. Design Phase

Based on user requirements and usage scenarios (such as temporary offices, accommodation, event support, etc.), complete the structural design and detailed drawings of the container house. The design should consider modularization, repeatable disassembly and reassembly, and reusability to meet the needs of different scenarios.

2. Material Selection

  • Structural Steel: Hot-dip galvanized cold-formed steel is commonly used, offering excellent rust and corrosion resistance to ensure the durability of the container house.
  • Wall and Roof Panels: Rock wool, glass wool, or polyurethane sandwich panels are often used, providing both thermal insulation and fire resistance.
  • Flooring Materials: Cement fiberboard or steel-wood composite flooring is typically used, providing a stable load-bearing foundation.
  • Wall and Ceiling Finishes: Metal panels or calcium silicate boards can be used to meet aesthetic and practical requirements.

3. Structural Fabrication

  • Steel Frame Welding: Steel cutting, welding, and surface treatment are completed in the factory to form a sturdy frame structure.
  • Wall and Roof Panel Prefabrication: According to design requirements, wall and roof panels are prefabricated, filled with insulation materials, and covered with finishes.

4. Functional System Pre-embedding

Pre-installation of doors, windows, electrical, plumbing, and other systems is completed in the factory to ensure accurate component matching during on-site installation, significantly reducing on-site construction time.

5. On-site Installation

  • Trial Assembly and Transportation: Trial assembly is conducted before leaving the factory to ensure accurate component matching, after which parts are transported to the site.
  • Rapid Assembly: During on-site installation, modules are simply hoisted into place and connected, effectively shortening the construction period and reducing on-site wet work.