Quay lại blog
Bài viết

Quyang Cement Prefabricated House Installation

Quản trị 18 tháng 9, 2026

The installation of Quyang cement prefabricated houses requires adherence to standardized procedures and attention to key considerations, as detailed below:

Installation Process

  1. Preparation Phase

    • Component Inspection: Verify that all prefabricated components (such as columns, beams, slabs, and walls) meet design requirements in terms of dimensions, specifications, and strength. Focus on checking the positions and quantities of reserved sleeves and reinforcing bars against the design drawings.
    • Material and Equipment Preparation: Prepare auxiliary materials such as cement mortar and sealing materials in advance, and test lifting equipment (such as cranes and forklifts) to ensure stable performance.
  2. Foundation Treatment

    • Foundation Construction: Select concrete pedestals or strip foundations based on geological conditions, ensuring a flat, solid foundation free from soft soil layers or debris.
    • Waterproofing and Damp-Proofing: Apply waterproof coatings or lay damp-proof layers on the foundation surface to prevent groundwater infiltration from affecting the structural stability of the house.
  3. Component Lifting and Connection

    • Positioning and Assembly: Lift components such as columns, beams, and slabs in the design sequence, securing key nodes with bolts or sleeve grouting to ensure structural integrity.
    • Gap Treatment: Fill gaps between wall panels with sealant or cement mortar to prevent rainwater leakage; reinforce sealing around door and window openings to improve airtightness.
  4. Inspection and Cleanup

    • Appearance Acceptance: Check that the house surface is flat, connections are secure, and there are no cracks or deformations.
    • Site Cleanup: Remove excess materials and tools, keeping the site tidy to avoid debris affecting subsequent use.

Precautions

  1. Purchase Genuine Products

    • Material Standards: Select components with prestressed reinforcing bars and concrete strength not lower than C30 to ensure crack resistance and load-bearing capacity.
    • Appearance Quality Inspection: Check for defects such as cracks or honeycombing on the component surface, ensuring that the quantity and specifications of reinforcing bars comply with national standards (e.g., GB/T 51231-2016).
  2. Proper Foundation Treatment

    • Geological Adaptation: Determine foundation dimensions, depth, and shape based on building weight, loads, and geological reports to prevent house tilting due to foundation settlement.
    • Drainage Design: Set drainage slopes or hidden drains around the foundation to prevent water accumulation from eroding the foundation.

Quyang cement prefabricated houses offer advantages such as thermal insulation, dry construction, short construction periods, and customizability, making them suitable for scenarios like villas, dormitories, and office buildings. Strict adherence to installation specifications ensures house safety, durability, and extended service life.