Prefabricated Slab House Construction

Quản trị 18 tháng 9, 2026

Prefabricated slab house construction mainly includes processes such as the production and installation of prefabricated slabs, as well as construction precautions. Its current status has gradually been replaced with the development of building technology, and existing houses have certain issues.

Production of Prefabricated Slabs

Prefabricated slabs are engineering modules or panels that are produced and processed at a prefabrication yard and then transported to the construction site for installation. During production, a hollow mold is first made using wooden planks. Steel bars are placed in the hollow part of the mold, and the hollow part is filled with cement. After it dries, the wooden planks are knocked off. There are two types of prefabricated slabs: solid and hollow. The hollow structure achieves lightweighting by reducing the non-load-bearing concrete, which ensures structural strength while reducing material usage and the self-weight of the floor slab.

Installation of Prefabricated Slabs

  1. Preparation before Lifting: For lifting composite slabs, lifting steel beams can be used to ensure that the lifting points bear force simultaneously, keeping the components stable and avoiding problems such as cracks and distortions during the lifting process.
  2. Base Treatment: Before placing the prefabricated slabs, the top surface of the wall that supports them needs to be leveled. The day before slab lifting, the top of the wall should be watered to moisten it (avoiding standing water). High-grade cement mortar should be used to carefully level the top of the wall, ensuring that the mortar is spread evenly and fully. When the slab is placed, the mortar is compacted, ensuring a "face-to-face" contact between the slab and the wall.
  3. Slab Bottom Support: During installation and cement pouring, supports need to be placed under the slabs to prevent the prefabricated slabs from being bent or cracked before their own strength is fully developed.
  4. Slab Joint Treatment: The gaps between the slabs need to be properly treated. If not handled properly, problems such as water leakage may occur later.

Construction Precautions

Overall connection is the core of prefabricated slab installation. Individual slabs need to be connected into a whole so that they can work in coordination with the entire house structure. If the connection between the slabs and the wall or between the slabs themselves is not tight, the floor slab will be in a "loose" state, posing safety hazards. At the same time, strict quality control is required to avoid shoddy work, such as using dry bricks or crushed stones to level the mortar layer on the top of the wall. It is necessary to ensure that the base treatment is flat and solid.

Current Status and Development of Prefabricated Slab Houses

Prefabricated slab houses originated in the early 20th century. In China, most residential buildings constructed before 1985 adopted this type of structure. With the development of building technology, cast-in-place concrete and prefabricated buildings have gradually replaced traditional prefabricated slab houses. Since 2022, China has implemented a policy of old building renovation, mainly focusing on the repair and renovation of prefabricated slab houses and only demolishing buildings that meet the criteria for dangerous buildings. Existing prefabricated slab houses generally have problems such as weak earthquake resistance, poor sound and heat insulation, and a service life of about 30 - 50 years. Some regions have already started demolition work.