[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"global_setting:vi":3,"categories:vi":20,"api:\u002Farticles:vi:{\"sort\":\"id:desc\",\"pagination[withCount]\":false,\"filters[slug][$eq]\":\"prefabricated-panel-house-construction-schedule\",\"pagination[page]\":1,\"pagination[pageSize]\":1,\"populate[cover]\":true,\"populate[category]\":true}":197,"blog-prev:vi:prefabricated-panel-house-construction-schedule:2026-09-18T16:06:13.644Z":240,"blog-next:vi:prefabricated-panel-house-construction-schedule:2026-09-18T16:06:13.644Z":244,"api:\u002Farticles:vi:{\"sort\":\"publishedAt:desc\",\"pagination[withCount]\":false,\"fields[0]\":\"title\",\"fields[1]\":\"slug\",\"fields[2]\":\"excerpt\",\"fields[3]\":\"publishedAt\",\"fields[4]\":\"createdAt\",\"populate[cover]\":true,\"filters[slug][$ne]\":\"prefabricated-panel-house-construction-schedule\",\"pagination[page]\":1,\"pagination[pageSize]\":4}":253},{"data":4,"meta":19},{"id":5,"documentId":6,"siteName":7,"siteTitle":8,"siteDescription":9,"email":10,"phone":11,"whatsapp":12,"createdAt":13,"updatedAt":14,"publishedAt":15,"locale":16,"address":17,"siteKeywords":18},47,"oa8f3tu3m17iipzazrxrmufk","Nghi Hàng Xuyên Biên","Nhà máy sản xuất nhà tiền chế Yihang _ Nhà container _ Nhà vệ sinh di động _ Nhà lắp ghép nhanh","Nhà tiền chế Yihang là nhà máy sản xuất chuyên nghiệp nhà tiền chế trọn gói, chuyên sản xuất nhà container, nhà container lắp ghép, nhà vệ sinh di động. Nhà máy cung cấp trực tiếp từ nguồn gốc, hỗ trợ sản xuất theo yêu cầu, lắp đặt nhanh chóng, tháo lắp tái sử dụng, ứng dụng rộng rãi trong các công trình xây dựng tạm, văn phòng ngoài trời, nhà ở tạm thời, các khu du lịch, chất lượng đảm bảo, tiến độ nhanh chóng, nhận sản xuất theo yêu cầu các công trình nhà tiền chế trong và ngoài nước.","xianglele@ehang-cross.com","+8619092593611 ","8619092593611 ","2026-08-17T15:42:51.402Z","2026-09-21T15:23:32.374Z","2026-09-21T15:23:32.427Z","vi","Zhejiang, China","Nhà Xưởng nhà tiền chế Yihang, nhà container, nhà vệ sinh di động, nhà lắp ghép nhanh",{},{"data":21,"meta":192},[22,39,47,55,63,71,78,93,101,109,149],{"id":23,"documentId":24,"name":25,"slug":26,"description":27,"createdAt":28,"updatedAt":28,"publishedAt":29,"locale":16,"parent":30,"children":38,"cover":27},410,"jgl16pgiujilzypxh7w1dvsf","Nhà Container Có Thể Tháo Gỡ Và Bao Bì Bằng Phẳng","flat-pack-and-detachable-container-houses",null,"2026-08-31T14:39:51.955Z","2026-08-31T14:49:28.000Z",{"id":31,"documentId":32,"name":33,"slug":34,"description":33,"createdAt":35,"updatedAt":36,"publishedAt":37,"locale":16},550,"r55sewcg5jmiwkpom4lipxas","Nhà Container","container","2026-08-31T14:34:58.099Z","2026-09-08T15:41:11.619Z","2026-09-08T15:41:12.186Z",[],{"id":40,"documentId":41,"name":42,"slug":43,"description":27,"createdAt":44,"updatedAt":44,"publishedAt":29,"locale":16,"parent":45,"children":46,"cover":27},412,"rgxh10ucmzziz0nsnhk2hoeq","Nhà container có thể gập lại và gấp gọn","foldable-folding-container-houses","2026-08-31T14:39:52.813Z",{"id":31,"documentId":32,"name":33,"slug":34,"description":33,"createdAt":35,"updatedAt":36,"publishedAt":37,"locale":16},[],{"id":48,"documentId":49,"name":50,"slug":51,"description":27,"createdAt":52,"updatedAt":52,"publishedAt":29,"locale":16,"parent":53,"children":54,"cover":27},414,"oc9q3a05evd1yqknsdqqnr7d","Nhà container có thể mở rộng","expandable-container-houses","2026-08-31T14:39:53.650Z",{"id":31,"documentId":32,"name":33,"slug":34,"description":33,"createdAt":35,"updatedAt":36,"publishedAt":37,"locale":16},[],{"id":56,"documentId":57,"name":58,"slug":59,"description":27,"createdAt":60,"updatedAt":60,"publishedAt":29,"locale":16,"parent":61,"children":62,"cover":27},416,"ovwz6cyf18poazkrojb8r4mm","Nhà hình Viên nang Vũ trụ & Cabin Táo","space-capsule-houses-apple-cabins","2026-08-31T14:39:54.517Z",{"id":31,"documentId":32,"name":33,"slug":34,"description":33,"createdAt":35,"updatedAt":36,"publishedAt":37,"locale":16},[],{"id":64,"documentId":65,"name":66,"slug":67,"description":27,"createdAt":68,"updatedAt":68,"publishedAt":29,"locale":16,"parent":69,"children":70,"cover":27},418,"fcg0r2nn01zvrruk7snqwji2","Nhà mô-đun & các ngôi nhà tiền chế khác","modular-homes-other-prefab-houses","2026-08-31T14:39:55.299Z",{"id":31,"documentId":32,"name":33,"slug":34,"description":33,"createdAt":35,"updatedAt":36,"publishedAt":37,"locale":16},[],{"id":72,"documentId":73,"name":50,"slug":74,"description":27,"createdAt":75,"updatedAt":75,"publishedAt":29,"locale":16,"parent":76,"children":77,"cover":27},420,"tjabq1gzspxnzftyarxqh5m6","iso-shipping-storage-containers","2026-08-31T14:39:56.130Z",{"id":31,"documentId":32,"name":33,"slug":34,"description":33,"createdAt":35,"updatedAt":36,"publishedAt":37,"locale":16},[],{"id":79,"documentId":80,"name":81,"slug":82,"description":27,"createdAt":83,"updatedAt":83,"publishedAt":29,"locale":16,"parent":84,"children":92,"cover":27},422,"czl0ibqkzm8vygbfe5qpo2l1","Bồn cầu di động bằng nhựa HDPE","hdpe-plastic-portable-toilets","2026-08-31T14:39:56.915Z",{"id":85,"documentId":86,"name":87,"slug":88,"description":87,"createdAt":89,"updatedAt":90,"publishedAt":91,"locale":16},478,"fu8tuiis68jmi0i5iokdq06e","Nhà vệ sinh di động","mobile-toilet","2026-08-31T14:34:59.884Z","2026-08-31T14:47:44.216Z","2026-08-31T14:47:44.742Z",[],{"id":94,"documentId":95,"name":96,"slug":97,"description":27,"createdAt":98,"updatedAt":98,"publishedAt":29,"locale":16,"parent":99,"children":100,"cover":27},424,"tec69y18rtmmv2tp4tb3y703","Nhà vệ sinh di động có kết cấu hàn","welded-structure-mobile-toilets","2026-08-31T14:39:58.139Z",{"id":85,"documentId":86,"name":87,"slug":88,"description":87,"createdAt":89,"updatedAt":90,"publishedAt":91,"locale":16},[],{"id":102,"documentId":103,"name":104,"slug":105,"description":27,"createdAt":106,"updatedAt":106,"publishedAt":29,"locale":16,"parent":107,"children":108,"cover":27},426,"mllynk5uc89sod5c8ndiqd7j","Nhà vệ sinh di động dạng tấm Sandwich","sandwich-panel-portable-toilets","2026-08-31T14:39:58.986Z",{"id":85,"documentId":86,"name":87,"slug":88,"description":87,"createdAt":89,"updatedAt":90,"publishedAt":91,"locale":16},[],{"id":85,"documentId":86,"name":87,"slug":88,"description":87,"createdAt":89,"updatedAt":90,"publishedAt":91,"locale":16,"parent":27,"children":110,"cover":114},[111,112,113],{"id":79,"documentId":80,"name":81,"slug":82,"description":27,"createdAt":83,"updatedAt":83,"publishedAt":29,"locale":16},{"id":94,"documentId":95,"name":96,"slug":97,"description":27,"createdAt":98,"updatedAt":98,"publishedAt":29,"locale":16},{"id":102,"documentId":103,"name":104,"slug":105,"description":27,"createdAt":106,"updatedAt":106,"publishedAt":29,"locale":16},{"id":115,"documentId":116,"name":117,"alternativeText":27,"caption":27,"focalPoint":27,"width":118,"height":118,"formats":119,"hash":143,"ext":121,"mime":124,"size":144,"url":145,"previewUrl":27,"provider":146,"provider_metadata":27,"createdAt":147,"updatedAt":147,"publishedAt":148},1225,"e8w1zqavtqaq3afulj8t4efj","H5a0c7cf6b7bb438da832dfc28e6b87c0X.jpg",800,{"small":120,"medium":129,"thumbnail":136},{"ext":121,"url":122,"hash":123,"mime":124,"name":125,"path":27,"size":126,"width":127,"height":127,"sizeInBytes":128},".jpg","https:\u002F\u002Fcaijing-img.oss-cn-hangzhou.aliyuncs.com\u002Fsmall_H5a0c7cf6b7bb438da832dfc28e6b87c0_X_3056827851.jpg","small_H5a0c7cf6b7bb438da832dfc28e6b87c0_X_3056827851","image\u002Fjpeg","small_H5a0c7cf6b7bb438da832dfc28e6b87c0X.jpg",23.63,500,23630,{"ext":121,"url":130,"hash":131,"mime":124,"name":132,"path":27,"size":133,"width":134,"height":134,"sizeInBytes":135},"https:\u002F\u002Fcaijing-img.oss-cn-hangzhou.aliyuncs.com\u002Fmedium_H5a0c7cf6b7bb438da832dfc28e6b87c0_X_3056827851.jpg","medium_H5a0c7cf6b7bb438da832dfc28e6b87c0_X_3056827851","medium_H5a0c7cf6b7bb438da832dfc28e6b87c0X.jpg",42.65,750,42649,{"ext":121,"url":137,"hash":138,"mime":124,"name":139,"path":27,"size":140,"width":141,"height":141,"sizeInBytes":142},"https:\u002F\u002Fcaijing-img.oss-cn-hangzhou.aliyuncs.com\u002Fthumbnail_H5a0c7cf6b7bb438da832dfc28e6b87c0_X_3056827851.jpg","thumbnail_H5a0c7cf6b7bb438da832dfc28e6b87c0_X_3056827851","thumbnail_H5a0c7cf6b7bb438da832dfc28e6b87c0X.jpg",4.19,156,4188,"H5a0c7cf6b7bb438da832dfc28e6b87c0_X_3056827851",43.48,"https:\u002F\u002Fcaijing-img.oss-cn-hangzhou.aliyuncs.com\u002FH5a0c7cf6b7bb438da832dfc28e6b87c0_X_3056827851.jpg","strapi-provider-upload-aliyun-oss","2026-08-23T12:40:07.717Z","2026-08-23T12:40:07.718Z",{"id":31,"documentId":32,"name":33,"slug":34,"description":33,"createdAt":35,"updatedAt":36,"publishedAt":37,"locale":16,"parent":27,"children":150,"cover":157},[151,152,153,154,155,156],{"id":23,"documentId":24,"name":25,"slug":26,"description":27,"createdAt":28,"updatedAt":28,"publishedAt":29,"locale":16},{"id":40,"documentId":41,"name":42,"slug":43,"description":27,"createdAt":44,"updatedAt":44,"publishedAt":29,"locale":16},{"id":48,"documentId":49,"name":50,"slug":51,"description":27,"createdAt":52,"updatedAt":52,"publishedAt":29,"locale":16},{"id":56,"documentId":57,"name":58,"slug":59,"description":27,"createdAt":60,"updatedAt":60,"publishedAt":29,"locale":16},{"id":64,"documentId":65,"name":66,"slug":67,"description":27,"createdAt":68,"updatedAt":68,"publishedAt":29,"locale":16},{"id":72,"documentId":73,"name":50,"slug":74,"description":27,"createdAt":75,"updatedAt":75,"publishedAt":29,"locale":16},{"id":158,"documentId":159,"name":160,"alternativeText":27,"caption":27,"focalPoint":27,"width":161,"height":161,"formats":162,"hash":188,"ext":121,"mime":124,"size":189,"url":190,"previewUrl":27,"provider":146,"provider_metadata":27,"createdAt":191,"updatedAt":191,"publishedAt":191},1223,"ammcra78h5i6ts27xrts3se5","He0540c3d9e0c47829bceb8aad3dcc0ccY.jpg",1920,{"large":163,"small":170,"medium":176,"thumbnail":182},{"ext":121,"url":164,"hash":165,"mime":124,"name":166,"path":27,"size":167,"width":168,"height":168,"sizeInBytes":169},"https:\u002F\u002Fcaijing-img.oss-cn-hangzhou.aliyuncs.com\u002Flarge_He0540c3d9e0c47829bceb8aad3dcc0cc_Y_86c1fb2a61.jpg","large_He0540c3d9e0c47829bceb8aad3dcc0cc_Y_86c1fb2a61","large_He0540c3d9e0c47829bceb8aad3dcc0ccY.jpg",215.13,1000,215132,{"ext":121,"url":171,"hash":172,"mime":124,"name":173,"path":27,"size":174,"width":127,"height":127,"sizeInBytes":175},"https:\u002F\u002Fcaijing-img.oss-cn-hangzhou.aliyuncs.com\u002Fsmall_He0540c3d9e0c47829bceb8aad3dcc0cc_Y_86c1fb2a61.jpg","small_He0540c3d9e0c47829bceb8aad3dcc0cc_Y_86c1fb2a61","small_He0540c3d9e0c47829bceb8aad3dcc0ccY.jpg",64.11,64109,{"ext":121,"url":177,"hash":178,"mime":124,"name":179,"path":27,"size":180,"width":134,"height":134,"sizeInBytes":181},"https:\u002F\u002Fcaijing-img.oss-cn-hangzhou.aliyuncs.com\u002Fmedium_He0540c3d9e0c47829bceb8aad3dcc0cc_Y_86c1fb2a61.jpg","medium_He0540c3d9e0c47829bceb8aad3dcc0cc_Y_86c1fb2a61","medium_He0540c3d9e0c47829bceb8aad3dcc0ccY.jpg",131.27,131270,{"ext":121,"url":183,"hash":184,"mime":124,"name":185,"path":27,"size":186,"width":141,"height":141,"sizeInBytes":187},"https:\u002F\u002Fcaijing-img.oss-cn-hangzhou.aliyuncs.com\u002Fthumbnail_He0540c3d9e0c47829bceb8aad3dcc0cc_Y_86c1fb2a61.jpg","thumbnail_He0540c3d9e0c47829bceb8aad3dcc0cc_Y_86c1fb2a61","thumbnail_He0540c3d9e0c47829bceb8aad3dcc0ccY.jpg",7.14,7138,"He0540c3d9e0c47829bceb8aad3dcc0cc_Y_86c1fb2a61",592.01,"https:\u002F\u002Fcaijing-img.oss-cn-hangzhou.aliyuncs.com\u002FHe0540c3d9e0c47829bceb8aad3dcc0cc_Y_86c1fb2a61.jpg","2026-08-23T08:54:19.423Z",{"pagination":193},{"page":194,"pageSize":195,"pageCount":194,"total":196},1,100,11,{"data":198,"meta":238},[199],{"id":200,"documentId":201,"title":202,"slug":203,"excerpt":27,"createdAt":204,"updatedAt":204,"publishedAt":205,"locale":206,"content":207,"seo_title":27,"seo_description":27,"seo_keywords":27,"isRecommend":208,"cover":209,"category":27},365940,"b1svp8e3vyqxhd4jq7xpjmtj","Construction Schedule of Prefabricated Panel Houses","prefabricated-panel-house-construction-schedule","2026-09-18T16:06:13.620Z","2026-09-18T16:06:13.644Z","en","**The construction schedule of prefabricated panel houses is influenced by multiple stages, including production, transportation, installation, and special processes. The overall construction period typically ranges from 2 to 4 months, depending on the project scale, process selection, and site conditions.**\n\n![](https:\u002F\u002Fcaijing-img.oss-cn-hangzhou.aliyuncs.com\u002Fgallery\u002Fimport_1788448991114_1p9hmu3r_88fa9b622f.jpg)\n\n### 1. Production Cycle\nAs the core component of the house, the production cycle of prefabricated panels directly affects the overall progress. **Generally, the production cycle for most standard prefabricated panels is 20-40 days**, depending on the panel specifications (such as length, thickness, and load-bearing capacity) and the manufacturer's production capacity. For example, standardized residential prefabricated floor slabs or wall panels can have their production cycle shortened to about 25 days if the manufacturer has advanced equipment and a mature production line. However, customized or special-function prefabricated panels (such as seismic structural panels or thermal insulation composite panels) may require more time for mold adjustment, material proportioning, and quality inspection.\n\n### 2. Transportation Time\nThe efficiency of the transportation stage is constrained by the distance to the construction site and traffic conditions. **Short-distance urban transportation (e.g., from the city center to the suburbs) typically takes 2-3 days**. When road conditions are good and there are no traffic restrictions, it is possible to achieve 'production on the same day and arrival on the next day'. **Inter-provincial or remote area transportation may extend to several weeks**, especially in mountainous, plateau, or harsh weather regions, where road capacity, vehicle scheduling, and weather impacts must be considered. For example, transporting from a prefabricated panel production base in East China to a construction site in the mountainous areas of Southwest China may double the transportation time due to winding mountain roads or landslides during the rainy season.\n\n### 3. Installation Time\nThe standardized design of prefabricated panels significantly shortens the on-site installation cycle. **Installation itself only takes a few days to a couple of weeks**, as workers only need to hoist, fix, and assemble the uniformly sized components according to the design drawings at the reserved foundation positions. However, if subsequent processes (such as exterior wall decoration, interior decoration, and landscaping) are included, **the overall wall-raising time for the building is about 1-2 months**, depending on the number of floors (high-rise buildings require layer-by-layer installation), structural complexity (such as the need for additional positioning for irregular components), and the efficiency of the construction team. For example, the installation of prefabricated panels for a 6-story residential building may be completed in 10 days, but the overall delivery may take about 60 days.\n\n### 4. Impact of Special Processes\nThe adoption of new processes can further compress the construction period. **Taking raft foundation construction as an example, using prefabricated panel formwork instead of traditional brick formwork can shorten the foundation cycle by 20%-30%**. For instance, a commercial complex project in Beijing reduced the originally planned 28-day foundation construction to 22 days through the use of prefabricated concrete formwork technology, while also reducing dust and noise pollution from on-site wet operations (such as bricklaying and plastering). In addition, modular prefabrication technology (such as integrated bathroom and kitchen units) enables parallel construction of 'installing the main structure while decorating the interior', further shortening the total construction period.\n\n### 5. Overall Construction Period Case Reference\nTaking wooden house construction as an example, if the factory prefabrication method is adopted, **the on-site installation of the main structure (wooden frame or integrated prefabricated wooden panel assembly) typically takes only 2-4 weeks**. Adding foundation construction, interior and exterior decoration, and acceptance processes, **the overall period is roughly 2-4 months**. This data indicates that the工期 (construction period) advantage of prefabricated panel houses is more significant in small and medium-sized projects, while super high-rise or complex structural buildings may experience extended periods due to factors such as technical coordination and approval processes.",false,{"id":210,"documentId":211,"name":212,"alternativeText":213,"caption":27,"focalPoint":27,"width":118,"height":118,"formats":214,"hash":233,"ext":121,"mime":124,"size":234,"url":235,"previewUrl":27,"provider":146,"provider_metadata":27,"createdAt":236,"updatedAt":236,"publishedAt":237},13374,"dm6gt8n9r1o4fknu70pay4zk","import_1788448991114_1p9hmu3r_88fa9b622f.jpg","BaojiContainer House",{"small":215,"medium":221,"thumbnail":227},{"ext":121,"url":216,"hash":217,"mime":124,"name":218,"path":27,"size":219,"width":127,"height":127,"sizeInBytes":220},"https:\u002F\u002Fcaijing-img.oss-cn-hangzhou.aliyuncs.com\u002Fsmall_import_1788448991114_1p9hmu3r_88fa9b622f_0c87079573.jpg","small_import_1788448991114_1p9hmu3r_88fa9b622f_0c87079573","small_import_1788448991114_1p9hmu3r_88fa9b622f.jpg",27.34,27338,{"ext":121,"url":222,"hash":223,"mime":124,"name":224,"path":27,"size":225,"width":134,"height":134,"sizeInBytes":226},"https:\u002F\u002Fcaijing-img.oss-cn-hangzhou.aliyuncs.com\u002Fmedium_import_1788448991114_1p9hmu3r_88fa9b622f_0c87079573.jpg","medium_import_1788448991114_1p9hmu3r_88fa9b622f_0c87079573","medium_import_1788448991114_1p9hmu3r_88fa9b622f.jpg",59.33,59327,{"ext":121,"url":228,"hash":229,"mime":124,"name":230,"path":27,"size":231,"width":141,"height":141,"sizeInBytes":232},"https:\u002F\u002Fcaijing-img.oss-cn-hangzhou.aliyuncs.com\u002Fthumbnail_import_1788448991114_1p9hmu3r_88fa9b622f_0c87079573.jpg","thumbnail_import_1788448991114_1p9hmu3r_88fa9b622f_0c87079573","thumbnail_import_1788448991114_1p9hmu3r_88fa9b622f.jpg",3.12,3121,"import_1788448991114_1p9hmu3r_88fa9b622f_0c87079573",50.61,"https:\u002F\u002Fcaijing-img.oss-cn-hangzhou.aliyuncs.com\u002Fimport_1788448991114_1p9hmu3r_88fa9b622f_0c87079573.jpg","2026-09-09T18:04:59.118Z","2026-09-09T18:04:59.119Z",{"pagination":239},{"page":194,"pageSize":194},{"data":241,"meta":242},[],{"pagination":243},{"page":194,"pageSize":194},{"data":245,"meta":251},[246],{"id":247,"documentId":248,"slug":249,"title":250},20778,"x68lya7xsp4oqhbhnhosnypa","xining-container-house-unit-prices","Đơn giá nhà container tại Xining",{"pagination":252},{"page":194,"pageSize":194},{"data":254,"meta":387},[255,286,322,357],{"id":247,"documentId":248,"title":250,"slug":249,"excerpt":27,"publishedAt":256,"createdAt":257,"cover":258},"2026-09-13T16:35:13.183Z","2026-09-13T16:35:13.161Z",{"id":259,"documentId":260,"name":261,"alternativeText":262,"caption":27,"focalPoint":27,"width":118,"height":118,"formats":263,"hash":282,"ext":121,"mime":124,"size":283,"url":284,"previewUrl":27,"provider":146,"provider_metadata":27,"createdAt":285,"updatedAt":285,"publishedAt":285},22021,"p03ed0yystyv2nelxabk9x12","import_1788378468007_k79wz9n6_b5269cb90e.jpg","Xining Container House Unit Prices",{"small":264,"medium":270,"thumbnail":276},{"ext":121,"url":265,"hash":266,"mime":124,"name":267,"path":27,"size":268,"width":127,"height":127,"sizeInBytes":269},"https:\u002F\u002Fcaijing-img.oss-cn-hangzhou.aliyuncs.com\u002Fsmall_import_1788378468007_k79wz9n6_b5269cb90e_a2c637a81b.jpg","small_import_1788378468007_k79wz9n6_b5269cb90e_a2c637a81b","small_import_1788378468007_k79wz9n6_b5269cb90e.jpg",21.38,21377,{"ext":121,"url":271,"hash":272,"mime":124,"name":273,"path":27,"size":274,"width":134,"height":134,"sizeInBytes":275},"https:\u002F\u002Fcaijing-img.oss-cn-hangzhou.aliyuncs.com\u002Fmedium_import_1788378468007_k79wz9n6_b5269cb90e_a2c637a81b.jpg","medium_import_1788378468007_k79wz9n6_b5269cb90e_a2c637a81b","medium_import_1788378468007_k79wz9n6_b5269cb90e.jpg",40.18,40181,{"ext":121,"url":277,"hash":278,"mime":124,"name":279,"path":27,"size":280,"width":141,"height":141,"sizeInBytes":281},"https:\u002F\u002Fcaijing-img.oss-cn-hangzhou.aliyuncs.com\u002Fthumbnail_import_1788378468007_k79wz9n6_b5269cb90e_a2c637a81b.jpg","thumbnail_import_1788378468007_k79wz9n6_b5269cb90e_a2c637a81b","thumbnail_import_1788378468007_k79wz9n6_b5269cb90e.jpg",3.84,3839,"import_1788378468007_k79wz9n6_b5269cb90e_a2c637a81b",41.59,"https:\u002F\u002Fcaijing-img.oss-cn-hangzhou.aliyuncs.com\u002Fimport_1788378468007_k79wz9n6_b5269cb90e_a2c637a81b.jpg","2026-09-13T16:35:12.857Z",{"id":287,"documentId":288,"title":289,"slug":290,"excerpt":27,"publishedAt":291,"createdAt":292,"cover":293},20770,"sgi5svbf4n4avofe57x6dcsv","Cải tạo nội thất nhà container chống cháy","fireproof-container-house-interior-fit-out","2026-09-13T16:35:06.552Z","2026-09-13T16:35:06.530Z",{"id":294,"documentId":295,"name":296,"alternativeText":297,"caption":27,"focalPoint":27,"width":298,"height":298,"formats":299,"hash":318,"ext":121,"mime":124,"size":319,"url":320,"previewUrl":27,"provider":146,"provider_metadata":27,"createdAt":321,"updatedAt":321,"publishedAt":321},22020,"qhvkmtjb61ibqhdlw5oge14y","import_1788446276172_67a0w9ok_683cef1a13.jpg","Fireproof Container House Interior Fit-Out",960,{"small":300,"medium":306,"thumbnail":312},{"ext":121,"url":301,"hash":302,"mime":124,"name":303,"path":27,"size":304,"width":127,"height":127,"sizeInBytes":305},"https:\u002F\u002Fcaijing-img.oss-cn-hangzhou.aliyuncs.com\u002Fsmall_import_1788446276172_67a0w9ok_683cef1a13_3d152cebf9.jpg","small_import_1788446276172_67a0w9ok_683cef1a13_3d152cebf9","small_import_1788446276172_67a0w9ok_683cef1a13.jpg",19.19,19190,{"ext":121,"url":307,"hash":308,"mime":124,"name":309,"path":27,"size":310,"width":134,"height":134,"sizeInBytes":311},"https:\u002F\u002Fcaijing-img.oss-cn-hangzhou.aliyuncs.com\u002Fmedium_import_1788446276172_67a0w9ok_683cef1a13_3d152cebf9.jpg","medium_import_1788446276172_67a0w9ok_683cef1a13_3d152cebf9","medium_import_1788446276172_67a0w9ok_683cef1a13.jpg",34.82,34824,{"ext":121,"url":313,"hash":314,"mime":124,"name":315,"path":27,"size":316,"width":141,"height":141,"sizeInBytes":317},"https:\u002F\u002Fcaijing-img.oss-cn-hangzhou.aliyuncs.com\u002Fthumbnail_import_1788446276172_67a0w9ok_683cef1a13_3d152cebf9.jpg","thumbnail_import_1788446276172_67a0w9ok_683cef1a13_3d152cebf9","thumbnail_import_1788446276172_67a0w9ok_683cef1a13.jpg",3.18,3182,"import_1788446276172_67a0w9ok_683cef1a13_3d152cebf9",45.15,"https:\u002F\u002Fcaijing-img.oss-cn-hangzhou.aliyuncs.com\u002Fimport_1788446276172_67a0w9ok_683cef1a13_3d152cebf9.jpg","2026-09-13T16:35:06.224Z",{"id":323,"documentId":324,"title":325,"slug":326,"excerpt":27,"publishedAt":327,"createdAt":328,"cover":329},20762,"buvs95mkb18kgbkzlmddktyf","Bảng giá nhà container Trương Dịch (Zhangye)","zhangye-container-house-price-list","2026-09-13T16:35:02.152Z","2026-09-13T16:35:02.130Z",{"id":330,"documentId":331,"name":332,"alternativeText":333,"caption":27,"focalPoint":27,"width":118,"height":118,"formats":334,"hash":353,"ext":121,"mime":124,"size":354,"url":355,"previewUrl":27,"provider":146,"provider_metadata":27,"createdAt":356,"updatedAt":356,"publishedAt":356},22019,"lxxo0iqjlln1xow8mbvtwkyi","import_1788446333146_kwozl0ic_a7dda214a9.jpg","Zhangye Container House Price List",{"small":335,"medium":341,"thumbnail":347},{"ext":121,"url":336,"hash":337,"mime":124,"name":338,"path":27,"size":339,"width":127,"height":127,"sizeInBytes":340},"https:\u002F\u002Fcaijing-img.oss-cn-hangzhou.aliyuncs.com\u002Fsmall_import_1788446333146_kwozl0ic_a7dda214a9_7c6cae683d.jpg","small_import_1788446333146_kwozl0ic_a7dda214a9_7c6cae683d","small_import_1788446333146_kwozl0ic_a7dda214a9.jpg",35.26,35264,{"ext":121,"url":342,"hash":343,"mime":124,"name":344,"path":27,"size":345,"width":134,"height":134,"sizeInBytes":346},"https:\u002F\u002Fcaijing-img.oss-cn-hangzhou.aliyuncs.com\u002Fmedium_import_1788446333146_kwozl0ic_a7dda214a9_7c6cae683d.jpg","medium_import_1788446333146_kwozl0ic_a7dda214a9_7c6cae683d","medium_import_1788446333146_kwozl0ic_a7dda214a9.jpg",71.12,71116,{"ext":121,"url":348,"hash":349,"mime":124,"name":350,"path":27,"size":351,"width":141,"height":141,"sizeInBytes":352},"https:\u002F\u002Fcaijing-img.oss-cn-hangzhou.aliyuncs.com\u002Fthumbnail_import_1788446333146_kwozl0ic_a7dda214a9_7c6cae683d.jpg","thumbnail_import_1788446333146_kwozl0ic_a7dda214a9_7c6cae683d","thumbnail_import_1788446333146_kwozl0ic_a7dda214a9.jpg",4.43,4425,"import_1788446333146_kwozl0ic_a7dda214a9_7c6cae683d",75.88,"https:\u002F\u002Fcaijing-img.oss-cn-hangzhou.aliyuncs.com\u002Fimport_1788446333146_kwozl0ic_a7dda214a9_7c6cae683d.jpg","2026-09-13T16:35:01.819Z",{"id":358,"documentId":359,"title":360,"slug":361,"excerpt":27,"publishedAt":362,"createdAt":363,"cover":364},20754,"q6kyv2arqf6ynkz4lzgg52sg","Nhà container ở được tại Tây Thanh (Xiqing)","xiqing-living-container-houses","2026-09-13T16:34:56.767Z","2026-09-13T16:34:56.744Z",{"id":365,"documentId":366,"name":367,"alternativeText":368,"caption":27,"focalPoint":27,"width":369,"height":369,"formats":370,"hash":383,"ext":121,"mime":124,"size":384,"url":385,"previewUrl":27,"provider":146,"provider_metadata":27,"createdAt":386,"updatedAt":386,"publishedAt":386},22018,"wjbpjnykbddwip672favl1ex","import_1788379355120_hoynh257_73cc5cd035.jpg","Xiqing Living Container Houses",720,{"small":371,"thumbnail":377},{"ext":121,"url":372,"hash":373,"mime":124,"name":374,"path":27,"size":375,"width":127,"height":127,"sizeInBytes":376},"https:\u002F\u002Fcaijing-img.oss-cn-hangzhou.aliyuncs.com\u002Fsmall_import_1788379355120_hoynh257_73cc5cd035_06c80101ee.jpg","small_import_1788379355120_hoynh257_73cc5cd035_06c80101ee","small_import_1788379355120_hoynh257_73cc5cd035.jpg",35.22,35223,{"ext":121,"url":378,"hash":379,"mime":124,"name":380,"path":27,"size":381,"width":141,"height":141,"sizeInBytes":382},"https:\u002F\u002Fcaijing-img.oss-cn-hangzhou.aliyuncs.com\u002Fthumbnail_import_1788379355120_hoynh257_73cc5cd035_06c80101ee.jpg","thumbnail_import_1788379355120_hoynh257_73cc5cd035_06c80101ee","thumbnail_import_1788379355120_hoynh257_73cc5cd035.jpg",5.77,5766,"import_1788379355120_hoynh257_73cc5cd035_06c80101ee",52.79,"https:\u002F\u002Fcaijing-img.oss-cn-hangzhou.aliyuncs.com\u002Fimport_1788379355120_hoynh257_73cc5cd035_06c80101ee.jpg","2026-09-13T16:34:56.442Z",{"pagination":388},{"page":194,"pageSize":389},4]