Whole Process of Prefabricated Houses

Quản trị 18 tháng 9, 2026

The whole process of prefabricated houses mainly includes five steps: foundation treatment, installation of foundation piles and beams, modular production and assembly, on-site assembly, and backfilling and finishing.

Foundation Treatment: First, the foundation needs to be leveled and a cushion layer poured. Then, the foundation pit is excavated to the designed depth. To prevent moisture loss from the concrete, a white plastic sheet is laid, and concrete is poured to form the foundation. This step provides a stable base for subsequent construction and ensures the overall structural safety of the house.

Installation of Foundation Piles and Beams: After the concrete has set, anchor plates are installed, and holes are drilled using a drill. These are fixed with expansion screws. Subsequently, pre-fabricated foundation piles (each weighing about 5 tons) are installed using a mobile crane, with lifting holes reserved at the four corners. After the foundation piles are installed, the beams are assembled and adjusted for levelness. They are fixed with nuts, filled with foam, and finally sealed with cement at the nut fixation points to prevent rust and corrosion. This step ensures the stability of the foundation structure through standardized operations.

Modular Production and Assembly: In the factory, the building is disassembled into independent modules, and components such as ceilings, floors, walls, and water and electricity pipelines are pre-fabricated through automated production lines. For example, the China Construction Hailong Intelligent Construction Industrial Park adopts a parallel operation mode and can deliver 20,000 to 30,000 modules annually. Modular production achieves standardization and scale, significantly improving construction efficiency.

On-site Assembly: After the pre-fabricated modules are transported to the construction site, they are assembled using equipment such as tower cranes. Each module is labeled with detailed information such as the project name, product model, and production date, and high-precision positioning technology is used to control errors to within millimeters. This “building block” assembly method significantly shortens the construction period.

Backfilling and Finishing: After the foundation frame structure is completed, soil backfilling is carried out, and grouting is performed on all component gaps to ensure structural stability. This step enhances the overall integrity of the house through filling and sealing, while also creating conditions for subsequent decoration and acceptance.

Prefabricated houses, through a combination of factory-standardized production and rapid on-site assembly, offer advantages such as shortened construction periods, controllable quality, and energy efficiency and environmental protection, making them an important development direction in the modern construction field.