Prefabricated House Turnkey Contract Template

Quản trị 19 tháng 9, 2026

The following prefabricated house turnkey contract template can be referred to, and details can be adjusted according to actual needs:

I. Contract Parties and Project Overview

  1. Contracting Parties: Clearly specify the names, ID numbers, or corporate information of Party A (the employer) and Party B (the contractor).
  2. Project Location: Specify the address, such as 'No. XX Road, XX District, XX City, XX Province'.
  3. Contracting Method: Turnkey mode, covering all aspects including design, construction, and material procurement.
  4. Project Duration: From the contract signing date to the completion acceptance date, or specify the exact start and end dates (e.g., 'From XXXX/XX/XX to XXXX/XX/XX' as in Contract Template 2).

II. Project Cost and Payment Method

  1. Total Cost: Clearly specify the amount (e.g., 'RMB XX yuan in total'), indicating whether taxes are included and the specific cost scope covered (e.g., design, materials, labor).
  2. Payment Milestones:
    • Advance Payment: A certain percentage (e.g., 30%-50%) is paid after contract signing, with the remaining amount paid in stages according to project progress (e.g., 40% at the mid-term and 30% after completion acceptance).
    • Final Payment: A certain percentage (e.g., 5%-10%) is retained as a quality guarantee deposit, to be paid after the warranty period expires.

III. Project Scope and Quality Requirements

  1. Design Requirements: Party A shall provide detailed design requirements and renderings, and Party B shall design according to these requirements and commence construction after Party A's confirmation.
  2. Construction Scope: Clearly specify the specific projects (e.g., wall coatings, floor paving, circuit renovations), referring to the enumeration methods in Contract Template 1 or 2.
  3. Material Standards: Party B shall procure materials according to the design plan, and Party A has the right to supervise the quality. Materials must comply with national standards or mutually agreed standards.
  4. Acceptance Standards: Based on the design plan and construction specifications, any non-conforming items must be reworked until they meet the standards.

IV. Warranty and Liability for Breach of Contract

  1. Warranty Period: At least 1 year from the completion acceptance date, specifying the warranty scope (e.g., damages caused by construction quality issues).
  2. Party A's Breach: Failure to pay on time requires payment of a penalty (e.g., 0.05% per day) and compensation for actual losses.
  3. Party B's Breach: Project delays require payment of a penalty (e.g., 'XX yuan per day' as in Contract Template 2), and quality issues require free rework and compensation for losses.

V. Dispute Resolution and Contract Effectiveness

  1. Dispute Resolution: Prioritize negotiation; if negotiation fails, a lawsuit can be filed in the court at the project location.
  2. Contract Effectiveness: The contract takes effect after both parties sign or seal it, with two copies, one for each party.

VI. Other Clauses

  1. Structural Modifications: If structural modifications to the house are involved, clarify Party A's notification obligation and Party B's construction responsibility.
  2. Property Protection: Party B shall protect Party A's property during construction and compensate for any damages.
  3. Supplementary Agreement: Any unmentioned matters can be covered in a supplementary agreement, which has the same legal effect as the main contract.

Tip: Adjust the clauses according to the specific project when using in practice, and it is recommended to consult legal professionals to ensure compliance.