Quay lại blog
Bài viết

Real Scene of Prefabricated Houses

Quản trị 17 tháng 9, 2026

The real scenes of prefabricated houses can be demonstrated through multiple scenarios, including construction sites, internal structures, assembly processes, and overseas displays, as detailed below:

Construction Sites: In some smart factories in China, the production of prefabricated houses has achieved a high degree of industrialization. Processes such as wall, floor, plumbing, electrical, and interior decoration are all completed in the workshop. Subsequently, the prefabricated modules are transported to the construction site for assembly. Taking a construction site in Longgang, Shenzhen, as an example, a crane lifts the modular building, and it takes only about 20 minutes from the ground to its designated position. Once the modules are in place, workers only need to tighten screws and connect pipelines to complete the assembly of a single floor. This “factory production + on-site assembly” model significantly shortens the construction period while reducing the complexity and environmental impact of on-site operations.

Internal Structures: Modular buildings undergo detailed internal finishing before leaving the factory. All walls are painted, floors are installed and covered with protective film, and wiring is completed in advance. This “turnkey” prefabrication method allows the house to be used directly after on-site assembly without the need for secondary decoration, ensuring construction quality and enhancing the living experience.

Assembly Process: Taking a prefabricated wooden house as an example, its assembly process demonstrates the flexibility and efficiency of modular construction. Workers first construct the house chassis frame on a pre-poured concrete foundation, lay floor joists, and install prefabricated beam components with white coatings, securing the joints with metal connectors to ensure platform stability. Subsequently, large wooden panels are transported to cover the platform, completing the foundation platform construction. Next, vertical construction begins as prefabricated wall modules are moved onto the platform and erected, fixed to the floor with nail guns. After the exterior wall frame is enclosed, internal fine division is carried out, including the construction of partition wall frames and the laying of second-floor floor beams. Finally, large triangular trusses are transported into position, and ground and roof workers cooperate to lift and precisely place them on the top beams of the walls, completing the roof construction.

Overseas Displays: In July 2026, Foreign Ministry spokesperson Mao Ning showcased the “unboxing” process of Chinese prefabricated houses on overseas social media platforms. An apartment shipped from China was fully prefabricated in the factory and quickly assembled on-site like building blocks. This display not only demonstrates the maturity of Chinese prefabricated housing technology but also highlights its competitiveness in the international market.