The installation of partition walls in prefabricated houses requires selecting an appropriate plan based on the material type. Common types include prefabricated panels, prefabricated ALC interior partition walls, and prefabricated reinforced concrete partition wall panels. The specific installation steps and key points are as follows:

I. Installation of Prefabricated Panel Partition Walls
- Construction Preparation
- Tools and Materials: Prepare galvanized square tubes, prefabricated welded connectors, films, varnishes, etc. Complete the construction of the ground beam (line marking → rebar planting → formwork erection → grouting → full grouting → formwork removal → curing).
- Mold Making: Fabricate a mold frame using galvanized square tubes according to the design dimensions and lay a film to prevent adhesion.
- Fabrication and Installation
- Fabrication: Place a steel mesh, pour concrete, and implant welded components. Remove the mold after solidification.
- Installation: Precisely align the embedded parts of the prefabricated panels with those of the ground beam, wall, and ceiling, and secure them through welding.
- Subsequent Processing
- Stone Paving: Drill and polish stones according to the plan and use the wet-laying method for construction.
- Quality Inspection: Check the perpendicularity, levelness, and gaps to ensure compliance with standards.
II. Installation of Prefabricated ALC Interior Partition Walls
- Construction Preparation
- Materials: ALC wall panels must meet the A1 fire resistance standard. Supporting materials include bonding mortar, pipe clamps, nails, etc.
- Technology: Familiarize with the drawings, prepare a panel layout plan, and prioritize the use of whole panels to minimize cutting.
- Installation Process
- Measurement and Line Marking: Verify the axis and elevation control lines.
- Base Treatment: Clean the installation area and mark the positioning lines.
- Wall Panel Installation: Use the pipe clamp fixing method, adjust the position, and secure it with pipe clamps and nails.
- Node Treatment: Arrange panels according to the design at door and window openings and reinforce them with U-shaped flat iron.
- Joint Filling and Protection
- Joint Filling: Fill gaps with polymer cement mortar to ensure flatness.
- Finished Product Protection: Store on a flat and dry site with a stacking height of ≤1.5m.
III. Installation of Prefabricated Reinforced Concrete Partition Wall Panels
- Construction Preparation
- Materials: Wall panels must comply with the 'Quality Inspection and Evaluation Standards for Reinforced Concrete Prefabricated Components' and be marked with model numbers and front/back signs.
- Working Conditions: The storage site must be flat and firm, the installation area must be cleaned, and positioning lines must be marked.
- Installation Process
- Installation in Place: Lift during structural construction or install manually later, using clamps for temporary support.
- Inspection and Alignment: Verify the model number and adjust the perpendicularity and horizontal position.
- Support and Reinforcement: Add supports and tighten wedges, with a panel bottom gap height of 20-30mm.
- Welding Fixation: Perform three-sided welding of embedded parts with the structural wall, ensuring the embedded parts do not protrude from the wall surface.
- Joint Filling Treatment: Fill gaps with 1:2.5 cement mortar mixed with 10% 107 glue.
- Quality Standards
- Panel joints must be dense and flat, with straight internal corners meeting decoration requirements.
IV. General Construction Key Points
- Material Control: Strictly inspect incoming materials and reject non-compliant ones.
- Process Supervision: Strengthen construction inspections and promptly rectify any issues found.
- Safety Measures: Provide safety education for construction personnel and equip them with necessary protective gear.
The installation plan should be selected based on project requirements (such as fire resistance, sound insulation, and construction period) and comply with current national construction acceptance standards.