Steps for Landing of Prefabricated Houses

Quản trị 18 tháng 9, 2026

The steps for landing of prefabricated houses mainly consist of five stages: customized production, full-vehicle transportation, overseas shipping, on-site assembly, and final detailing and acceptance.

Customized Production, Modular Packaging: Based on the specific requirements of overseas customers, such as house layout, style, and functional needs, house modules are mass-produced in factories. During production, all modules are uniformly coded for subsequent management and identification. Simultaneously, classification acceptance is carried out to ensure that each module meets quality standards. To adapt to the overseas shipping environment, modules are provided with waterproof, anti-corrosion, and shock-proof protection to safeguard them from damage during transportation.

Full-Vehicle Transportation, Direct to Port: The finished product modules are transferred to domestic ports via specialized flatbed trucks. The dimensions of these modules are fully compatible with international standard shipping containers, enabling efficient use of container space, avoiding waste, and significantly reducing transportation costs.

Overseas Shipping, Global Distribution: The packaged house modules are shipped on ocean-going cargo vessels to more than 150 countries and regions worldwide. The shipping time varies depending on the destination, with Southeast Asia taking approximately one week, the Middle East requiring over 20 days, and Europe and the Americas needing about a month. Throughout the transportation process, full logistics traceability is available, allowing customers to monitor the status of their shipments at any time.

On-Site Assembly, Rapid Formation: Upon arrival at overseas ports, the house modules are transported directly to the construction site. The assembly process is straightforward and does not require traditional construction procedures such as bricklaying, plastering, or pipeline installation. Simply use a crane to lift the modules to designated positions, connect the interfaces, and complete alignment and locking operations, similar to assembling Lego blocks, and then connect the water and electricity supplies.

Final Detailing and Acceptance, Immediate Use: After assembly, workers reinforce the nodes of the house to enhance structural stability, perform final exterior wall work to improve aesthetics, test the pipelines to ensure proper functioning of water and electricity facilities, and clean the site to maintain tidiness. Upon completion of these tasks, the house can be handed over in its entirety. After passing acceptance, the house can be directly used for residence, office, or commercial purposes, quickly adapting to the landing needs of various scenarios.