Prefabricated House Installation Method

Quản trị 18 tháng 9, 2026

The installation of prefabricated houses mainly adopts a modular construction model, completing the overall assembly through factory-prefabricated modules and on-site assembly.

I. Core Installation Process

The installation of prefabricated houses is centered around modularity, breaking down the building into independent modules (such as ceilings, floors, and walls), which are then produced to standardized specifications in a factory and transported to the site for assembly. The specific steps are as follows:

  1. Factory Prefabrication Stage

    • Structural Module Production: Structural components such as ceilings, floors, and walls are prefabricated on factory assembly lines using reinforced concrete or lightweight steel structures to ensure strength and precision.
    • Pipeline Embedding: Electrical, water, and ventilation systems are embedded in the modules in advance at the factory to avoid on-site trenching that could damage the structure and improve construction efficiency.
    • Integrated Decoration: Some modules can incorporate interior finishes (such as wall coatings and flooring installations), reducing on-site decoration work.
  2. Transportation and On-Site Preparation

    • Module Transportation: Depending on module size, flatbed trucks or specialized transportation vehicles are selected to ensure that modules remain undamaged and undeformed during transit.
    • Foundation Construction: On-site foundation work (such as concrete pouring and anchor bolt embedding) is completed in advance to provide precise positioning references for module placement.
  3. On-Site Assembly Stage

    • Module Hoisting: Tower cranes or truck-mounted cranes are used to hoist modules in the designed sequence to their designated positions, securing them with bolts or welding.
    • Connection Treatment: High-strength connectors (such as steel plates and bolts) or welding processes are used between modules to ensure structural integrity; gaps are filled with sealant to prevent leakage.
    • Pipeline Connection: Pre-embedded electrical and water pipelines are connected using quick couplings or welding, and their water and power supply functions are tested for normal operation.

II. Technical Advantages

  1. Short Construction Period: Factory prefabrication and on-site construction proceed simultaneously, with assembly speed more than 50% faster than traditional construction methods.
  2. Controllable Quality: The stable factory environment ensures module dimensional accuracy to the millimeter level, reducing human errors.
  3. Energy Efficiency and Environmental Protection: On-site wet work is reduced, lowering dust and noise pollution, with material waste rates below 5%.
  4. Convenient Maintenance: The modular design facilitates later inspection, repair, or replacement of components, extending the building's service life.

III. Typical Case

A real estate project in Shanghai adopted prefabricated house technology, using tower cranes to precisely hoist prefabricated "building block" modules (such as walls with doors and windows and floor slabs with integrated bathrooms). The main structure was completed in just 3 months, shortening the construction period by 40% compared to traditional methods.